# The River Humber Gas Pipeline Replacement Order 2016, Schedule 5: Streets subject to alteration of layout

Extent: E+W+S

Table 7
(1)
Area
(2)
Street subject to Alteration of Layout
(3)
Description of Alteration
North Lincolnshire
Thornton Road and College Road
Temporary construction access.
Temporary widening of the junction of the roads at the location shown as Work No. 6A on sheet 1 of the access and rights of way plans.
North Lincolnshire
Soff Lane
Temporary construction access.
Temporary widening of the junction of Soff Lane and the existing private access at location 6B on sheet 1 of the access and rights of way plans.
North Lincolnshire
Chapel Field Road
Temporary construction access.
Widening of the road at points shown as Work Nos. 6D, 6F and 6G and temporary widening of Work Nos. 6E and 6R on sheets 2 and 5 of the access and rights of way plans.
North Lincolnshire
Ferry Road
Temporary construction access.
Widening of the road at points shown as Work Nos. 6H, 6I, 6J, 6K and 6L on sheets 3 and 4 of the access and rights of way plans.
North Lincolnshire
Ferry Road and East Marsh Road
Temporary construction access.
Widening of the junction of the roads at the point shown as Work No. 6M on sheet 4 of the access and rights of way plans.
North Lincolnshire
East Marsh Road
Temporary construction access.
Widening of the road and junction with the existing private track at Rose Hill Farm at the locations marked as Work Nos. 6N, 6O and 6P on sheets 4 and 5 of the access and rights of way plans.
North Lincolnshire
East Marsh Road and Chapel Field Road
Temporary construction access.
Widening of the junction of the roads at the point marked as Work No. 6Q on sheet 5 of the access and rights of way plans.
East Riding of Yorkshire
Thorngumbald Road
Temporary construction access.
Temporary widening of the road at the location marked as Work No. 9A on sheet 7 of the access and rights of way plans.
East Riding of Yorkshire
Farbridge Lane and the Junction with Paull Road
Temporary construction access.
Temporary widening at the location marked as Work No. 9C on sheet 8 of the access and rights of way plans.

---
Source: https://www.legislation.gov.uk/uksi/2016/853/schedule/5 (the official version)