# The River Humber Gas Pipeline Replacement Order 2016, Schedule 6: Streets and public rights of way to be temporarily stopped up

Extent: E+W+S

Table 7
(1)
Area
(2)
Street/Footpath subject to Temporary Stopping Up
(3)
Extent of Temporary Stopping Up
East Riding of Yorkshire
Footpath 1
Between points A and B as shown on the access and rights of way plans.
East Riding of Yorkshire
Footpath 6
Between points C and D as shown on the access and rights of way plans.

---