Paragraph 1
The works which the undertaker is authorised to construct and maintain by article 3(1) are the following works in the Humber Estuary in the parish of Drypool in the City of Kingston-upon-Hull—
Work No. 1 — A tidal stream electrical generating station situated at reference point 510440E and 428175N and near to the river wall at the site known as Victoria Dock Village consisting of—
a floating tidal stream generator located by two vertical piles approximately 50 metres from the river wall; and
an access and cable bridge comprising gangways supported on two piles linking the tidal stream generator to the shore;
Work No. 2 — A cable commencing at the tidal stream generator comprised in Work No. 1 and terminating at reference point 510293E and 428295N in a switchroom inside the building known as The Deep Business Centre.