# The River Mersey (Mersey Gateway Bridge) Order 2011, Paragraph 14

Extent: E+W+S

If as a result of the construction of any specified work or protective work any part of the towing path or access way beside the Bridgewater Canal, or any public right of way giving access to the Bridgewater Canal, is temporarily closed to pedestrians or cyclists, the undertaker shall provide a substitute path or paths for such time as the closure continues to the satisfaction of the relevant highway authority and MSCC and shall reinstate, on completion of the specified work or protective work, to the same standard and to the satisfaction of the relevant highway authority and MSCC the towing path or access way beside the Bridgewater Canal (such towing path or access way to be of no less width or benefit than the towing path or access way replaced).

---
Source: https://www.legislation.gov.uk/uksi/2011/41/schedule/10/paragraph/14 (the official version)
Page: https://openlegislation.uk/river-mersey-mersey-gateway-bridge-order-2011/schedule-10/paragraph-14
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.