# The River Thames (Hungerford Footbridges) Order 1999, Article 4: Power to deviate


In constructing or maintaining the scheduled works, the undertaker may
(a) deviate laterally from the lines or situations shown on the deposited plan entitled “Works Plan” within the limits of deviation; and
(b) deviate vertically from the levels shown for those works on the deposited sections—
(i) to any extent not exceeding 1 metre upwards, and
(ii) to any such extent downwards as may be necessary or convenient but subject to the consent in writing of the Port Authority.

---