# The River Thames (Hungerford Footbridges) Order 1999, Paragraph 41


In this Part of this Schedule—
“construction” shall include reconstruction, altering, replacing, relaying, removal, maintenance and repair of the specified works;
“engineer” means the engineer appointed by LRT;
“plans” includes sections, drawings, particulars and schedules of construction;
“the pier” means Charing Cross Pier and any works, apparatus and equipment connected therewith; and
“the specified works” means so much of the authorised works as may be situated within 15 metres (measured in any direction) of, or may in any way affect, the pier and includes the construction, of any such work.

---