# The River Thames (Hungerford Footbridges) Order 1999, Paragraph 9


Where so required by the engineer, the undertaker shall, to the reasonable satisfaction of the engineer, fence off the specified works or take such other steps as the engineer may require to be taken for the purpose of separating the specified works from railway property, whether on a temporary or permanent basis or both.

---
Source: https://www.legislation.gov.uk/uksi/1999/2981/schedule/10/paragraph/9 (the official version)
Page: https://openlegislation.uk/river-thames-hungerford-footbridges-order-1999/schedule-10/paragraph-9
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

