Schedule 8 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
Original text. Later amendments are not shown.
| (1) | (2) | (3) | (4) |
|---|
| Area | Number of land shown on deposited plan entitled “Land Plan” | Purpose for which temporary possession may be taken in connection with the authorised works | Authorised works |
| London Borough of Lambeth | 301: 46 square metres of Queen’s Walk | For the provision of a working site and access for construction purposes and provision of a temporary footpath | Work No. 4 |
| 302: 273 square metres of Queen’s Walk beneath Charing Cross Railway Bridge | For the provision of a working site and access for construction purposes and provision of a temporary footpath | The scheduled works |
| 303: 887 square metres of Queen’s Walk | For the provision of a working site and access for construction purposes and for the provision of a temporary footpath | The scheduled works |