# The River Tyne (Tunnels) Order 2005, Article 3: Power to construct and maintain works

Extent: E+W

(1) The undertaker may—
(a) construct and maintain the scheduled works; and
(b) break out and remove such structures that are contained within the limits of land to be acquired or used as may be necessary, expedient or convenient for the construction or maintenance of the scheduled works.
(2) Subject to article 4, the scheduled works shall be constructed in the lines or situations shown on the deposited plans and in accordance with the levels shown on the deposited sections.
(3) Subject to paragraph (5), the undertaker may carry out and maintain such other works (of whatever nature) as may be necessary or expedient for the purposes of, in connection with or in consequence of, the construction and maintenance of the scheduled works.
(4) The undertaker may remove any works carried out by it pursuant to this Order which have been constructed as temporary works or which it no longer requires.
(5) Paragraph (3) shall only authorise the carrying out or maintenance of works outside the limits of deviation if the works are carried out, constructed or maintained on land contained within the limits of land to be acquired or used.

---
Source: https://www.legislation.gov.uk/uksi/2005/2222/article/3 (the official version)