# The River Tyne (Tunnels) Order 2005, Paragraph 61

Extent: E+W

In this Part of this Schedule—
“construction” includes execution, placing, alteration and reconstruction and “construct” and “constructed” have corresponding meanings;
“the engineer” means an engineer appointed by Network Rail Infrastructure Ltd for the purpose in question;
“plans” includes sections, designs, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction) and programmes;
“NRI” means Network Rail Infrastructure Ltd;
“Network Rail” means NRI and any associated company of NRI which holds property for railway purposes, and for the purpose of this definition “associated company” means any company which is (within the meaning of section 736 of the Companies Act 1985) the holding company of NRI, a subsidiary of NRI or another subsidiary of the holding company of NRI;
“railway property” means any railway belonging to NRI and any works, apparatus and equipment belonging to Network Rail connected with any such railway and includes any land held or used by Network Rail for the purposes of such railway or works, apparatus or equipment; and
“specified work” means so much of any of the authorised works as is situated upon, across, under, over or within 15 metres of, or may in any way adversely affect, railway property.

---
Source: https://www.legislation.gov.uk/uksi/2005/2222/schedule/10/paragraph/61 (the official version)
Page: https://openlegislation.uk/river-tyne-tunnels-order-2005/schedule-10/paragraph-61
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

