  "url": "https://openlegislation.uk/riverside-energy-park-order-2020",
  "json_url": "https://openlegislation.uk/riverside-energy-park-order-2020.json",
  "id": "uksi/2020/419",
  "title": "The Riverside Energy Park Order 2020",
  "short_title": "Riverside Energy Park 2020",
  "long_title": "This Order authorises Cory Environmental Holdings Limited pursuant to the provisions of this Order (referred to in this Order as the undertaker) to construct, operate and maintain a generating station with a capacity of over 50 megawatts but below 300 megawatts.",
  "citation": "S.I. 2020/419",
  "type": "uksi",
  "year": "2020",
  "number": "419",
  "version": "current",
  "date": "2020-04-09",
  "revised": true,
  "valid_from": "2023-02-17",
  "extent": "E+W",
  "unapplied_effects": 0,
  "provisions": [
    {
      "path": "introduction",
      "kind": "introduction",
      "number": null,
      "heading": "Introductory text",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/introduction",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "part/1",
      "kind": "part",
      "number": "1",
      "heading": "PRELIMINARY",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/1",
      "kind": "article",
      "number": "1",
      "heading": "Citation and commencement",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-1",
      "extent": "E+W",
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "article/2",
      "kind": "article",
      "number": "2",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-2",
      "extent": "E+W",
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "part/2",
      "kind": "part",
      "number": "2",
      "heading": "WORK PROVISIONS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "part/2/crossheading/principal-powers",
      "kind": "crossheading",
      "number": null,
      "heading": "Principal powers",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/3",
      "kind": "article",
      "number": "3",
      "heading": "Development consent granted by the Order",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-3",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/principal-powers"
    },
    {
      "path": "article/4",
      "kind": "article",
      "number": "4",
      "heading": "Maintenance of authorised development",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-4",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/principal-powers"
    },
    {
      "path": "article/5",
      "kind": "article",
      "number": "5",
      "heading": "Operation of the authorised development",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-5",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/principal-powers"
    },
    {
      "path": "article/6",
      "kind": "article",
      "number": "6",
      "heading": "Disapplication of legislative provisions and modifications to section 36 consent and RRRF planning permission",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-6",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/principal-powers"
    },
    {
      "path": "article/7",
      "kind": "article",
      "number": "7",
      "heading": "Port of London Act 1968",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-7",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/principal-powers"
    },
    {
      "path": "article/8",
      "kind": "article",
      "number": "8",
      "heading": "Benefit of this Order",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-8",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/principal-powers"
    },
    {
      "path": "article/9",
      "kind": "article",
      "number": "9",
      "heading": "Consent to transfer benefit of the Order",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-9",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/principal-powers"
    },
    {
      "path": "article/10",
      "kind": "article",
      "number": "10",
      "heading": "Guarantees in respect of payment of compensation",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-10",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/principal-powers"
    },
    {
      "path": "part/2/crossheading/streets",
      "kind": "crossheading",
      "number": null,
      "heading": "Streets",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/11",
      "kind": "article",
      "number": "11",
      "heading": "Street works",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-11",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/streets"
    },
    {
      "path": "article/12",
      "kind": "article",
      "number": "12",
      "heading": "Power to alter layout, etc., of streets",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-12",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/streets"
    },
    {
      "path": "article/13",
      "kind": "article",
      "number": "13",
      "heading": "Temporary prohibition or restriction of use of streets and public rights of way",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-13",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/streets"
    },
    {
      "path": "article/14",
      "kind": "article",
      "number": "14",
      "heading": "Permanent stopping up of streets",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-14",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/streets"
    },
    {
      "path": "article/15",
      "kind": "article",
      "number": "15",
      "heading": "Access to works",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-15",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/streets"
    },
    {
      "path": "article/16",
      "kind": "article",
      "number": "16",
      "heading": "Agreements with street authorities",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-16",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/streets"
    },
    {
      "path": "article/17",
      "kind": "article",
      "number": "17",
      "heading": "Traffic regulation measures",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-17",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/streets"
    },
    {
      "path": "part/2/crossheading/supplementary-powers",
      "kind": "crossheading",
      "number": null,
      "heading": "Supplementary powers",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/18",
      "kind": "article",
      "number": "18",
      "heading": "Discharge of water",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-18",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/supplementary-powers"
    },
    {
      "path": "article/19",
      "kind": "article",
      "number": "19",
      "heading": "Authority to survey and investigate the land",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-19",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/supplementary-powers"
    },
    {
      "path": "article/20",
      "kind": "article",
      "number": "20",
      "heading": "Protective work to buildings",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-20",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/supplementary-powers"
    },
    {
      "path": "article/21",
      "kind": "article",
      "number": "21",
      "heading": "Felling or lopping of trees",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-21",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/crossheading/supplementary-powers"
    },
    {
      "path": "part/3",
      "kind": "part",
      "number": "3",
      "heading": "POWERS OF ACQUISITION AND POSSESSION OF LAND",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "part/3/crossheading/powers-of-acquisition",
      "kind": "crossheading",
      "number": null,
      "heading": "Powers of acquisition",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/22",
      "kind": "article",
      "number": "22",
      "heading": "Compulsory acquisition of land",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-22",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/powers-of-acquisition"
    },
    {
      "path": "article/23",
      "kind": "article",
      "number": "23",
      "heading": "Time limit for exercise of authority to acquire land compulsorily",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-23",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/powers-of-acquisition"
    },
    {
      "path": "article/24",
      "kind": "article",
      "number": "24",
      "heading": "Compulsory acquisition of rights",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-24",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/powers-of-acquisition"
    },
    {
      "path": "article/25",
      "kind": "article",
      "number": "25",
      "heading": "Acquisition of subsoil only",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-25",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/powers-of-acquisition"
    },
    {
      "path": "article/26",
      "kind": "article",
      "number": "26",
      "heading": "Private rights",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-26",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/powers-of-acquisition"
    },
    {
      "path": "article/27",
      "kind": "article",
      "number": "27",
      "heading": "Power to override easements and other rights",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-27",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/powers-of-acquisition"
    },
    {
      "path": "article/28",
      "kind": "article",
      "number": "28",
      "heading": "Application of the 1981 Act",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-28",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/powers-of-acquisition"
    },
    {
      "path": "article/29",
      "kind": "article",
      "number": "29",
      "heading": "Modification of Part 1 of the 1965 Act",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-29",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/powers-of-acquisition"
    },
    {
      "path": "article/30",
      "kind": "article",
      "number": "30",
      "heading": "Rights under or over streets",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-30",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/powers-of-acquisition"
    },
    {
      "path": "part/3/crossheading/temporary-possession-of-land",
      "kind": "crossheading",
      "number": null,
      "heading": "Temporary possession of land",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/31",
      "kind": "article",
      "number": "31",
      "heading": "Temporary use of land for carrying out the authorised development",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-31",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/temporary-possession-of-land"
    },
    {
      "path": "article/32",
      "kind": "article",
      "number": "32",
      "heading": "Temporary use of land for maintaining the authorised development",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-32",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/temporary-possession-of-land"
    },
    {
      "path": "part/3/crossheading/supplementary",
      "kind": "crossheading",
      "number": null,
      "heading": "Supplementary",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/33",
      "kind": "article",
      "number": "33",
      "heading": "Statutory undertakers",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-33",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/supplementary"
    },
    {
      "path": "article/34",
      "kind": "article",
      "number": "34",
      "heading": "Apparatus and rights of statutory undertakers in stopped up streets",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-34",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/supplementary"
    },
    {
      "path": "article/35",
      "kind": "article",
      "number": "35",
      "heading": "Recovery of costs of new connections",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-35",
      "extent": "E+W",
      "status": null,
      "parent": "part/3/crossheading/supplementary"
    },
    {
      "path": "part/4",
      "kind": "part",
      "number": "4",
      "heading": "MISCELLANEOUS AND GENERAL",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/36",
      "kind": "article",
      "number": "36",
      "heading": "Application of landlord and tenant law",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-36",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/37",
      "kind": "article",
      "number": "37",
      "heading": "Operational land for the purposes of the 1990 Act",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-37",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/38",
      "kind": "article",
      "number": "38",
      "heading": "Defence to proceedings in respect of statutory nuisance",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-38",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/39",
      "kind": "article",
      "number": "39",
      "heading": "Protective provisions",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-39",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/40",
      "kind": "article",
      "number": "40",
      "heading": "Certification of plans etc.",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-40",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/41",
      "kind": "article",
      "number": "41",
      "heading": "Service of notices",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-41",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/42",
      "kind": "article",
      "number": "42",
      "heading": "Procedures in relation to certain approvals etc.",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-42",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/43",
      "kind": "article",
      "number": "43",
      "heading": "No double recovery",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/article-43",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "signature",
      "kind": "signature",
      "number": null,
      "heading": "Signature",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/signature",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/1",
      "kind": "schedule",
      "number": "1",
      "heading": "AUTHORISED DEVELOPMENT",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/1/paragraph/wrapper1n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper1n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper2n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper2n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper3n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper3n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper4n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper4n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper5n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper5n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper6n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper6n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper7n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper7n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper8n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper8n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper9n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper9n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper10n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper10n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper11n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper11n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper12n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper12n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper13n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper13n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper14n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper14n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper15n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-1/paragraph-wrapper15n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/2",
      "kind": "schedule",
      "number": "2",
      "heading": "REQUIREMENTS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/2/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Time limits",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "Detailed design approval",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": "Parameters of authorised development",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": "Pre–commencement biodiversity mitigation strategy",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": "Biodiversity and landscape mitigation strategy",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": "Replacement planting for Work No. 9",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": "Archaeology",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-7",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": "Highway access",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-8",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/9",
      "kind": "paragraph",
      "number": "9",
      "heading": "Surface and foul water drainage",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-9",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/10",
      "kind": "paragraph",
      "number": "10",
      "heading": "Ground conditions and ground stability",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-10",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/11",
      "kind": "paragraph",
      "number": "11",
      "heading": "Code of construction practice",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-11",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/12",
      "kind": "paragraph",
      "number": "12",
      "heading": "Construction Hours",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-12",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/13",
      "kind": "paragraph",
      "number": "13",
      "heading": "Construction traffic management plan(s)",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-13",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/14",
      "kind": "paragraph",
      "number": "14",
      "heading": "Heavy commercial vehicle movements delivering waste",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-14",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/15",
      "kind": "paragraph",
      "number": "15",
      "heading": "Emission limits – Work No. 1B",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-15",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/16",
      "kind": "paragraph",
      "number": "16",
      "heading": "Waste hierarchy scheme",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-16",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/17",
      "kind": "paragraph",
      "number": "17",
      "heading": "Operational worker travel plan",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-17",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/18",
      "kind": "paragraph",
      "number": "18",
      "heading": "Operational lighting strategy",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-18",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/19",
      "kind": "paragraph",
      "number": "19",
      "heading": "Control of operational noise",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-19",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/20",
      "kind": "paragraph",
      "number": "20",
      "heading": "River wall",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-20",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/21",
      "kind": "paragraph",
      "number": "21",
      "heading": "Community benefits",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-21",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/22",
      "kind": "paragraph",
      "number": "22",
      "heading": "Notice of start of commissioning and notice of date of final commissioning",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-22",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/23",
      "kind": "paragraph",
      "number": "23",
      "heading": "Phasing of construction and commissioning of Work No. 1",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-23",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/24",
      "kind": "paragraph",
      "number": "24",
      "heading": "Combined heat and power",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-24",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/25",
      "kind": "paragraph",
      "number": "25",
      "heading": "Use of compost material and gas from Work No. 1B",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-25",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/26",
      "kind": "paragraph",
      "number": "26",
      "heading": "Decommissioning",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-26",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/27",
      "kind": "paragraph",
      "number": "27",
      "heading": "Amendments to approved details",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-27",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/28",
      "kind": "paragraph",
      "number": "28",
      "heading": "Flood Risk Activity Permit Area",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-28",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/29",
      "kind": "paragraph",
      "number": "29",
      "heading": "Finished Floor Levels",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-29",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/30",
      "kind": "paragraph",
      "number": "30",
      "heading": "Metropolitan Open Land",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-30",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/31",
      "kind": "paragraph",
      "number": "31",
      "heading": "Delivery and Servicing Plan",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-31",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/32",
      "kind": "paragraph",
      "number": "32",
      "heading": "Tonnage cap",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-32",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/33",
      "kind": "paragraph",
      "number": "33",
      "heading": "Notification from the undertaker",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-33",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/3",
      "kind": "schedule",
      "number": "3",
      "heading": "STREETS SUBJECT TO STREET WORKS",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-3",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/4",
      "kind": "schedule",
      "number": "4",
      "heading": "STREETS SUBJECT TO PERMANENT AND TEMPORARY ALTERATION OF LAYOUT",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/4/part/1",
      "kind": "part",
      "number": "1",
      "heading": "PERMANENT ALTERATION OF LAYOUT",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-4/part-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/part/2",
      "kind": "part",
      "number": "2",
      "heading": "TEMPORARY ALTERATION OF LAYOUT",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-4/part-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/5",
      "kind": "schedule",
      "number": "5",
      "heading": "TEMPORARY PROHIBITION OR RESTRICTION OF THE USE OF STREETS OR PUBLIC RIGHTS OF WAY",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-5",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/6",
      "kind": "schedule",
      "number": "6",
      "heading": "PERMANENT STOPPING UP OF STREETS",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-6",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/7",
      "kind": "schedule",
      "number": "7",
      "heading": "LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/7/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-7/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/7"
    },
    {
      "path": "schedule/8",
      "kind": "schedule",
      "number": "8",
      "heading": "MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS AND IMPOSITION OF NEW RESTRICTIVE COVENANTS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/8/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Compensation enactments",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-8/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-8/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-8/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": "Application of Part 1 of the 1965 Act",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-8/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-8/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/9",
      "kind": "schedule",
      "number": "9",
      "heading": "LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-9",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/10",
      "kind": "schedule",
      "number": "10",
      "heading": "PROTECTIVE PROVISIONS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/10/part/1",
      "kind": "part",
      "number": "1",
      "heading": "FOR THE PROTECTION OF RRRL",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10"
    },
    {
      "path": "schedule/10/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-7",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-8",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/9",
      "kind": "paragraph",
      "number": "9",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-9",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/10",
      "kind": "paragraph",
      "number": "10",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-10",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/11",
      "kind": "paragraph",
      "number": "11",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-11",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/12",
      "kind": "paragraph",
      "number": "12",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-12",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/13",
      "kind": "paragraph",
      "number": "13",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-13",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/14",
      "kind": "paragraph",
      "number": "14",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-14",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/paragraph/15",
      "kind": "paragraph",
      "number": "15",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-15",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/1"
    },
    {
      "path": "schedule/10/part/2",
      "kind": "part",
      "number": "2",
      "heading": "FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10"
    },
    {
      "path": "schedule/10/paragraph/16",
      "kind": "paragraph",
      "number": "16",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-16",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/2"
    },
    {
      "path": "schedule/10/paragraph/17",
      "kind": "paragraph",
      "number": "17",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-17",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/2"
    },
    {
      "path": "schedule/10/paragraph/18",
      "kind": "paragraph",
      "number": "18",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-18",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/2"
    },
    {
      "path": "schedule/10/paragraph/19",
      "kind": "paragraph",
      "number": "19",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-19",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/2"
    },
    {
      "path": "schedule/10/paragraph/20",
      "kind": "paragraph",
      "number": "20",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-20",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/2"
    },
    {
      "path": "schedule/10/paragraph/21",
      "kind": "paragraph",
      "number": "21",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-21",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/2"
    },
    {
      "path": "schedule/10/paragraph/22",
      "kind": "paragraph",
      "number": "22",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-22",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/2"
    },
    {
      "path": "schedule/10/paragraph/23",
      "kind": "paragraph",
      "number": "23",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-23",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/2"
    },
    {
      "path": "schedule/10/paragraph/24",
      "kind": "paragraph",
      "number": "24",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-24",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/2"
    },
    {
      "path": "schedule/10/paragraph/25",
      "kind": "paragraph",
      "number": "25",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-25",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/2"
    },
    {
      "path": "schedule/10/paragraph/26",
      "kind": "paragraph",
      "number": "26",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-26",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/2"
    },
    {
      "path": "schedule/10/part/3",
      "kind": "part",
      "number": "3",
      "heading": "FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10"
    },
    {
      "path": "schedule/10/paragraph/27",
      "kind": "paragraph",
      "number": "27",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-27",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/3"
    },
    {
      "path": "schedule/10/paragraph/28",
      "kind": "paragraph",
      "number": "28",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-28",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/3"
    },
    {
      "path": "schedule/10/paragraph/29",
      "kind": "paragraph",
      "number": "29",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-29",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/3"
    },
    {
      "path": "schedule/10/paragraph/30",
      "kind": "paragraph",
      "number": "30",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-30",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/3"
    },
    {
      "path": "schedule/10/paragraph/31",
      "kind": "paragraph",
      "number": "31",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-31",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/3"
    },
    {
      "path": "schedule/10/part/4",
      "kind": "part",
      "number": "4",
      "heading": "FOR THE PROTECTION OF THE ENVIRONMENT AGENCY",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10"
    },
    {
      "path": "schedule/10/paragraph/32",
      "kind": "paragraph",
      "number": "32",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-32",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/4"
    },
    {
      "path": "schedule/10/paragraph/33",
      "kind": "paragraph",
      "number": "33",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-33",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/4"
    },
    {
      "path": "schedule/10/paragraph/34",
      "kind": "paragraph",
      "number": "34",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-34",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/4"
    },
    {
      "path": "schedule/10/paragraph/35",
      "kind": "paragraph",
      "number": "35",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-35",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/4"
    },
    {
      "path": "schedule/10/paragraph/36",
      "kind": "paragraph",
      "number": "36",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-36",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/4"
    },
    {
      "path": "schedule/10/paragraph/37",
      "kind": "paragraph",
      "number": "37",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-37",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/4"
    },
    {
      "path": "schedule/10/paragraph/38",
      "kind": "paragraph",
      "number": "38",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-38",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/4"
    },
    {
      "path": "schedule/10/paragraph/39",
      "kind": "paragraph",
      "number": "39",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-39",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/4"
    },
    {
      "path": "schedule/10/paragraph/40",
      "kind": "paragraph",
      "number": "40",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-40",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/4"
    },
    {
      "path": "schedule/10/paragraph/41",
      "kind": "paragraph",
      "number": "41",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-41",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/4"
    },
    {
      "path": "schedule/10/paragraph/42",
      "kind": "paragraph",
      "number": "42",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-42",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/4"
    },
    {
      "path": "schedule/10/paragraph/43",
      "kind": "paragraph",
      "number": "43",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-43",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/4"
    },
    {
      "path": "schedule/10/part/5",
      "kind": "part",
      "number": "5",
      "heading": "FOR THE PROTECTION OF RAILWAY INTERESTS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10"
    },
    {
      "path": "schedule/10/paragraph/44",
      "kind": "paragraph",
      "number": "44",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-44",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/45",
      "kind": "paragraph",
      "number": "45",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-45",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/46",
      "kind": "paragraph",
      "number": "46",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-46",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/47",
      "kind": "paragraph",
      "number": "47",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-47",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/48",
      "kind": "paragraph",
      "number": "48",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-48",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/49",
      "kind": "paragraph",
      "number": "49",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-49",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/50",
      "kind": "paragraph",
      "number": "50",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-50",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/51",
      "kind": "paragraph",
      "number": "51",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-51",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/52",
      "kind": "paragraph",
      "number": "52",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-52",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/53",
      "kind": "paragraph",
      "number": "53",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-53",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/54",
      "kind": "paragraph",
      "number": "54",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-54",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/55",
      "kind": "paragraph",
      "number": "55",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-55",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/56",
      "kind": "paragraph",
      "number": "56",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-56",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/57",
      "kind": "paragraph",
      "number": "57",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-57",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/58",
      "kind": "paragraph",
      "number": "58",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-58",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/59",
      "kind": "paragraph",
      "number": "59",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-59",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/60",
      "kind": "paragraph",
      "number": "60",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-60",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/61",
      "kind": "paragraph",
      "number": "61",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-61",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/62",
      "kind": "paragraph",
      "number": "62",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-62",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/63",
      "kind": "paragraph",
      "number": "63",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-63",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/64",
      "kind": "paragraph",
      "number": "64",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-64",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/paragraph/65",
      "kind": "paragraph",
      "number": "65",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-65",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/5"
    },
    {
      "path": "schedule/10/part/6",
      "kind": "part",
      "number": "6",
      "heading": "FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY UNDERTAKER",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10"
    },
    {
      "path": "schedule/10/paragraph/66",
      "kind": "paragraph",
      "number": "66",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-66",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/67",
      "kind": "paragraph",
      "number": "67",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-67",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/68",
      "kind": "paragraph",
      "number": "68",
      "heading": "On Street Apparatus",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-68",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/69",
      "kind": "paragraph",
      "number": "69",
      "heading": "Apparatus of National Grid in stopped up streets",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-69",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/70",
      "kind": "paragraph",
      "number": "70",
      "heading": "Protective works to buildings",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-70",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/71",
      "kind": "paragraph",
      "number": "71",
      "heading": "Acquisition of land",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-71",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/72",
      "kind": "paragraph",
      "number": "72",
      "heading": "Removal of apparatus",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-72",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/73",
      "kind": "paragraph",
      "number": "73",
      "heading": "Facilities and rights for alternative apparatus",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-73",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/74",
      "kind": "paragraph",
      "number": "74",
      "heading": "Retained apparatus",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-74",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/75",
      "kind": "paragraph",
      "number": "75",
      "heading": "Expenses",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-75",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/76",
      "kind": "paragraph",
      "number": "76",
      "heading": "Indemnity",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-76",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/77",
      "kind": "paragraph",
      "number": "77",
      "heading": "Enactments and agreements",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-77",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/78",
      "kind": "paragraph",
      "number": "78",
      "heading": "Co–operation",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-78",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/79",
      "kind": "paragraph",
      "number": "79",
      "heading": "Access",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-79",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/80",
      "kind": "paragraph",
      "number": "80",
      "heading": "Arbitration",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-80",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/paragraph/81",
      "kind": "paragraph",
      "number": "81",
      "heading": "Notices",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-81",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/6"
    },
    {
      "path": "schedule/10/part/7",
      "kind": "part",
      "number": "7",
      "heading": "FOR THE PROTECTION OF UK POWER NETWORKS LIMITED, LONDON POWER NETWORKS PLC AND SOUTH EAST POWER NETWORKS PLC",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10"
    },
    {
      "path": "schedule/10/paragraph/82",
      "kind": "paragraph",
      "number": "82",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-82",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/7"
    },
    {
      "path": "schedule/10/paragraph/83",
      "kind": "paragraph",
      "number": "83",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-83",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/7"
    },
    {
      "path": "schedule/10/paragraph/84",
      "kind": "paragraph",
      "number": "84",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-84",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/7"
    },
    {
      "path": "schedule/10/paragraph/85",
      "kind": "paragraph",
      "number": "85",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-85",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/7"
    },
    {
      "path": "schedule/10/paragraph/86",
      "kind": "paragraph",
      "number": "86",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-86",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/7"
    },
    {
      "path": "schedule/10/paragraph/87",
      "kind": "paragraph",
      "number": "87",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-87",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/7"
    },
    {
      "path": "schedule/10/paragraph/88",
      "kind": "paragraph",
      "number": "88",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-88",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/7"
    },
    {
      "path": "schedule/10/paragraph/89",
      "kind": "paragraph",
      "number": "89",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-89",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/7"
    },
    {
      "path": "schedule/10/paragraph/90",
      "kind": "paragraph",
      "number": "90",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-90",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/7"
    },
    {
      "path": "schedule/10/paragraph/91",
      "kind": "paragraph",
      "number": "91",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-91",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/7"
    },
    {
      "path": "schedule/10/paragraph/92",
      "kind": "paragraph",
      "number": "92",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-92",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/7"
    },
    {
      "path": "schedule/10/paragraph/93",
      "kind": "paragraph",
      "number": "93",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-93",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/7"
    },
    {
      "path": "schedule/10/part/8",
      "kind": "part",
      "number": "8",
      "heading": "FOR THE PROTECTION OF THAMES WATER UTILITIES LIMITED",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10"
    },
    {
      "path": "schedule/10/paragraph/94",
      "kind": "paragraph",
      "number": "94",
      "heading": "Application",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-94",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/8"
    },
    {
      "path": "schedule/10/paragraph/95",
      "kind": "paragraph",
      "number": "95",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-95",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/8"
    },
    {
      "path": "schedule/10/paragraph/96",
      "kind": "paragraph",
      "number": "96",
      "heading": "Apparatus",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-96",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/8"
    },
    {
      "path": "schedule/10/paragraph/97",
      "kind": "paragraph",
      "number": "97",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-97",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/8"
    },
    {
      "path": "schedule/10/paragraph/98",
      "kind": "paragraph",
      "number": "98",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-98",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/8"
    },
    {
      "path": "schedule/10/paragraph/99",
      "kind": "paragraph",
      "number": "99",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-99",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/8"
    },
    {
      "path": "schedule/10/paragraph/100",
      "kind": "paragraph",
      "number": "100",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-100",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/8"
    },
    {
      "path": "schedule/10/paragraph/101",
      "kind": "paragraph",
      "number": "101",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-101",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/8"
    },
    {
      "path": "schedule/10/paragraph/102",
      "kind": "paragraph",
      "number": "102",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-102",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/8"
    },
    {
      "path": "schedule/10/paragraph/103",
      "kind": "paragraph",
      "number": "103",
      "heading": "Consultation",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-103",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/8"
    },
    {
      "path": "schedule/10/part/9",
      "kind": "part",
      "number": "9",
      "heading": "FOR THE PROTECTION OF SOUTHERN GAS NETWORKS PLC AS GAS UNDERTAKER",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10"
    },
    {
      "path": "schedule/10/paragraph/104",
      "kind": "paragraph",
      "number": "104",
      "heading": "Application",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-104",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/105",
      "kind": "paragraph",
      "number": "105",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-105",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/106",
      "kind": "paragraph",
      "number": "106",
      "heading": "On Street Apparatus",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-106",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/107",
      "kind": "paragraph",
      "number": "107",
      "heading": "Apparatus of SGN in stopped up streets",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-107",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/108",
      "kind": "paragraph",
      "number": "108",
      "heading": "Protective works to buildings",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-108",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/109",
      "kind": "paragraph",
      "number": "109",
      "heading": "Acquisition of land",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-109",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/110",
      "kind": "paragraph",
      "number": "110",
      "heading": "Removal of apparatus",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-110",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/111",
      "kind": "paragraph",
      "number": "111",
      "heading": "Facilities and rights for alternative apparatus",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-111",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/112",
      "kind": "paragraph",
      "number": "112",
      "heading": "Retained apparatus: protection of SGN",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-112",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/113",
      "kind": "paragraph",
      "number": "113",
      "heading": "Expenses",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-113",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/114",
      "kind": "paragraph",
      "number": "114",
      "heading": "Indemnity",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-114",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/115",
      "kind": "paragraph",
      "number": "115",
      "heading": "Enactments and agreements",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-115",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/116",
      "kind": "paragraph",
      "number": "116",
      "heading": "Co-operation",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-116",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/117",
      "kind": "paragraph",
      "number": "117",
      "heading": "Access",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-117",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/118",
      "kind": "paragraph",
      "number": "118",
      "heading": "Arbitration",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-118",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/10/paragraph/119",
      "kind": "paragraph",
      "number": "119",
      "heading": "Notices",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-10/paragraph-119",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10/part/9"
    },
    {
      "path": "schedule/11",
      "kind": "schedule",
      "number": "11",
      "heading": "DOCUMENTS AND PLANS TO BE CERTIFIED",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-11",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/12",
      "kind": "schedule",
      "number": "12",
      "heading": "PROCEDURE IN RELATION TO CERTAIN APPROVALS ETC.",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/12/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-12/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12"
    },
    {
      "path": "schedule/12/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "Applications made under requirements",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-12/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12"
    },
    {
      "path": "schedule/12/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": "Further information and consultation",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-12/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12"
    },
    {
      "path": "schedule/12/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": "Appeals",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-12/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12"
    },
    {
      "path": "schedule/12/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": "Application to protective provisions",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-12/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12"
    },
    {
      "path": "schedule/13",
      "kind": "schedule",
      "number": "13",
      "heading": "MODIFICATIONS TO THE SECTION 36 CONSENT AND RRRF PLANNING PERMISSION",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/13/part/1",
      "kind": "part",
      "number": "1",
      "heading": "SECTION 36 CONSENT",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13"
    },
    {
      "path": "schedule/13/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-13/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13/part/1"
    },
    {
      "path": "schedule/13/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-13/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13/part/1"
    },
    {
      "path": "schedule/13/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-13/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13/part/1"
    },
    {
      "path": "schedule/13/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-13/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13/part/1"
    },
    {
      "path": "schedule/13/part/2",
      "kind": "part",
      "number": "2",
      "heading": "RRRF PLANNING PERMISSION",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13"
    },
    {
      "path": "schedule/13/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-13/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13/part/2"
    },
    {
      "path": "schedule/13/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-13/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13/part/2"
    },
    {
      "path": "schedule/13/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": null,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/schedule-13/paragraph-7",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13/part/2"
    },
    {
      "path": "note",
      "kind": "note",
      "number": null,
      "heading": "Explanatory note",
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/note",
      "extent": "E+W",
      "status": null,
      "parent": null
    }
  ],
  "has_text": true,
  "pdfs": [
    {
      "title": "Printed copy",
      "main": true,
      "language": null,
      "date": "2020-04-15",
      "size": 670540,
      "url": "https://openlegislation.uk/riverside-energy-park-order-2020/pdf/uksi_20200419_en.pdf",
      "source_url": "https://www.legislation.gov.uk/uksi/2020/419/pdfs/uksi_20200419_en.pdf"
    }
  ],
  "outstanding_effects": [],
  "made_under": [],
  "changes_made_to": 233,
  "changes_made_to_url": "https://openlegislation.uk/riverside-energy-park-order-2020/changes.json",
  "changes_made_by": 248,
  "changes_made_by_url": "https://openlegislation.uk/riverside-energy-park-order-2020/changes/by-it.json",
  "instruments_made_under": 0,
  "instruments_made_under_url": "https://openlegislation.uk/riverside-energy-park-order-2020/instruments.json",
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2020/419",
    "retrieved_at": "2026-10-28T22:31:05.557847+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}