# The Riverside Energy Park Order 2020, Paragraph 3: Parameters of authorised development

Extent: E+W

(1) The elements of the authorised development listed in column (1) of the table below (design parameters) must not exceed the maximum dimensions and levels and, where applicable, the minimum dimensions, set out in relation to that element in columns (3) to (7) of that table.
Table 1
(1) Element of authorised development
(2) Work No.
(3) Maximum length (metres)
(4) Maximum width (metres)
(5) Maximum height (metres) AOD
(6) Minimum height (metres) above surrounding ground level
(7) Maximum depth (metres) below AOD
Main Riverside Energy Park Building
1A (excluding Work No.1A(iv), 1C and 1E
200
102
65
–
–
Solid fuel storage bunker
Part of Work No. 1A(i)
–
–
–
–
8
Anaerobic digestion system
1B
(excluding Work No. 1B(vi) and Work No. 1B(vii)
87
68
43
–
–
Other integral process buildings and structures
1D, 2(b), 3, 4, 5, 6 and 7
111
116
38
–
–
Emissions stacks(s)
1A(iv)
–
46
113
90
–
Emission stack
1B(vi)
11
8
Gas Flare
1B(vii)
17
4
(2) The above surrounding ground level in respect of Work No. 1 must comply with the following parameters: a minimum level of one metre AOD and maximum level of three metres AOD.

---
Source: https://www.legislation.gov.uk/uksi/2020/419/schedule/2/paragraph/3 (the official version)
Page: https://openlegislation.uk/riverside-energy-park-order-2020/schedule-2/paragraph-3