Paragraph 4 The Improvements
The bridge road—
(a)
plane off existing surface;
(b)
remove existing road surface including existing timber setts to deck plates;
(c)
re-install water proofing to the Bridge’s deck plates;
(d)
reconstruct the bridge road including a new surface at the same level as the existing bridge road;
(e)
reinstate vehicle restraint barrier connection in accordance with the PBI 2022;
(f)
provide road lines, markings and signage in accordance with the DMRB and the Traffic Signs Manual 2018 (as amended);
(g)
clear any protruding vegetation along the length of the bridge road.