Regulation 2 Interpretation

Original text. Later amendments are not shown.

(1)

In these Regulations—

  • “the Act” means the New Roads and Street Works Act 1991;

  • “bridleway” has the same meaning as in section 47 of the Countryside (Scotland) Act 1967f1;

  • “cycle track” has the same meaning as in section 151(2) of the Roads (Scotland) Act 1984f2;

  • “day” means a working day;

  • “footpath” has the same meaning as in section 151(2) of the Roads (Scotland) Act 1984;

  • “major projects” means projects which have been identified specifically in the annual operating programme of the undertaker or roads authority, or which, though not specifically identified in such programme, would normally be planned to commence at least six months in advance of works commencing;

  • “minor works” means works (not being emergency works or urgent works) whether in the footway, verge or carriageway, which are of a planned duration of not more than 3 days, do not form part of a rolling programme and do not involve at any one time more than 30 metres of works or leave less than 3 metres width of carriageway available for traffic or less than 2.5 metres width of carriageway where the traffic is expected to consist only of motor cars and light locomotives within the meaning of section 185(1) of the Road Traffic Act 1988f3;

  • “month” means a calendar month;

  • “person responsible for securing registration” means, in relation to any information, the person responsible for conveying such information to the road works authority for registration in the road works register;

  • “statutory undertaker” means an undertaker who is entitled to carry out road works by virtue of a statutory right;

  • “the road works register” means a register required to be kept by virtue of section 112(1);

  • “standard works” means all works which are not emergency works, urgent works or minor works;

  • “traffic sensitive road” means a road designated by a road works authority as traffic sensitive pursuant to section 123 and in a case where a limited designation is made pursuant to section 123(3) any reference to works in a traffic sensitive road shall be construed as a reference to works to be executed at the times and dates specified in such a designation;

  • “urgent works” means road works (not being emergency works) whose execution at the time they are executed is required (or which the person responsible for the works believes on reasonable grounds to be required)—

    1. (a)

      to prevent or put an end to an unplanned interruption of any supply or service provided by the undertaker;

    2. (b)

      to avoid substantial loss to the undertaker in relation to an existing service; or

    3. (c)

      to reconnect supplies or services where the undertaker would be under a civil or criminal liability if the reconnection is delayed until after the expiration of the appropriate notice period,

    and includes works which cannot reasonably be severed from such works.

(2)

A reference in these Regulations to a numbered section is a reference to the section bearing that number in the Act; a reference to a numbered regulation is a reference to the regulation bearing that number in these Regulations; and a reference to a paragraph is a reference to the appropriate paragraph in the regulation in which the reference appears.

Annotations

Footnotes

f1

1967 c. 86.

f2

1984 c. 54.

f3

1988 c. 52.