# Robin Rigg Offshore Wind Farm (Navigation and Fishing) (Scotland) Act 2003, Section 2: Power to deviate from specified locations


In constructing and maintaining the turbines, the electrical substation or the anemometry mast, the undertaker may deviate laterally up to a limit of 50 metres from the locations described in the schedule to this Act.

---