# The Roll-over Protective Structures for Construction Plant (EEC Requirements) Regulations 1988, Regulation 7: EEC inspections


The approved body may carry out EEC inspections in Great Britain of any ROPS being produced of a type in respect of which an EEC type-examination certificate has been issued under these Regulations or under the law of Northern Ireland or of a member State other than the United Kingdom if requested to do so by the approved other body which granted the EEC type-examination certificate, and for that purpose a duly authorised officer of an approved body may, on production if requested of his authority, at all reasonable times enter into premises where any such ROPS is for the time being held by or on behalf of the manufacturer, importer or other supplier of the ROPS and remove any such ROPS as a sample.

---
Source: https://www.legislation.gov.uk/uksi/1988/363/regulation/7 (the official version)
Page: https://openlegislation.uk/roll-over-protective-structures-for-construction-plant-eec-requirements-regulations-1988/regulation-7
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

