# The Rother Valley Railway (Bodiam to Robertsbridge Junction) Order 2023, Paragraph 27


Any difference arising between the Company and the drainage authority under this Part of this Schedule (other than a difference as to the meaning or construction of this Part of this Schedule) is to be referred to and settled by arbitration in accordance with article 40 (arbitration).

---