# The Sandwell Borough Council (Patent Shaft/Moorcroft Infrastructure) (Walsall Canal Bridge) Scheme 1993 Confirmation Instrument 1993, Paragraph 1


The Council are authorised to construct over the navigable waters of the Walsall Canal the bridges specified in the Schedule to this Scheme as part of the highway to be constructed by The Black Country Development Corporation in connection with the Patent Shaft/Moorcroft Development Site, Wednesbury in the said Borough, and which bridges are to become highways maintainable by public expense upon completion.

---
Source: https://www.legislation.gov.uk/uksi/1993/2302/schedule/paragraph/1 (the official version)
Page: https://openlegislation.uk/sandwell-borough-council-patent-shaftmoorcroft-infrastructure-walsall-canal-bridge-scheme-1993-confirmation-instrument-1993/schedule/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

