# The Scarweather Sands Offshore Wind Farm Order 2004, Paragraph 1


The works which the undertaker is authorised to construct and maintain by article 3(1) are the following works on the bed of Swansea Bay adjoining the coast between Porthcawl in the County Borough of Bridgend and Port Talbot in the County Borough of Neath Port Talbot and on land within the County Borough of Neath Port Talbot—
Work No. 1 — A wind energy electrical generating station consisting of—
(a) up to 30 wind turbines generators fixed to the seabed by one or more piles or gravity foundations and extending to a height of up to 130.5 metres above the level of high water, fitted with rotating blades and situated at the following locations—
Wind turbine number
Reference point Easting
Reference point Northing
1
269103
177986
2
269219
177481
3
269361
176982
4
269828
178465
5
269928
177953
6
270057
177448
7
270214
176951
8
270569
178920
9
270651
178407
10
270763
177901
11
270907
177402
12
271081
176912
13
271368
178982
14
271440
178540
15
271537
178103
16
271660
177672
17
271808
177250
18
271980
176836
19
272167
179040
20
272251
178566
21
272367
178099
22
272516
177641
23
272696
177195
24
272907
176762
25
272657
178920
26
273059
178614
27
273184
178160
28
273344
177716
29
273537
177286
30
273763
176872
(b) a network of cables connecting the wind turbines to each other.
Work No. 2 — A connection between Work No. 1 and Work No. 2A consisting of up to four marine feeder cables along routes commencing by connections with one or more of the wind turbines, then proceeding in a north-easterly direction for 7.22 kilometres until they reach the shore and terminating by a connection with Work No. 2A.
Work No. 2A — An extension of the cables comprised in Work No. 2 buried underground, commencing in a junction box at reference point 277406E, 184576N, extending for 121 metres in an easterly direction and terminating in Work No. 3.
Work No. 3 — An electrical substation situated at 277527E, 184608N.
Work No. 4 — An onshore cable connection with the electrical grid consisting of two electric lines, commencing at Work No. 3 and carried overhead in a north-easterly direction to reference points 278758E, 185469N and 278784E, 185392N, then proceeding underground across the railway sidings and Swansea to London railway and terminating by a connection with the existing electricity pylon.
Work No. 5 — A new road providing a construction and maintenance access between Work No. 3 and the road known as the harbour road.

---
Source: https://www.legislation.gov.uk/wsi/2004/3054/schedule/1/paragraph/1 (the official version)
Page: https://openlegislation.uk/scarweather-sands-offshore-wind-farm-order-2004/schedule-1/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.