# The Scarweather Sands Offshore Wind Farm Order 2004, Paragraph 9


Where so required by the engineer the undertaker must, to the reasonable satisfaction of the engineer, fence off the relevant works, or take such other steps as the engineer may require to be taken for the purpose of separating the relevant works from railway property, whether on a temporary or permanent basis or both.

---