# The Scottish Secure Tenants (Right to Repair) Regulations 2002, Schedule: DEFECTS, REPAIRS OF WHICH ARE QUALIFYING REPAIRS AND MAXIMUM TIME FOR COMPLETION


Column 1
Column 2
(Defect)
(Maximum period in working days from date immediately following the date of notification of qualifying repair or inspection)
Blocked flue to open fire or boiler.
1
Blocked or leaking foul drains, soil stacks or toilet pans where there is no other toilet in the house.
1
Blocked sink, bath or drain.
1
Electric power–
loss of electric power;
1
partial loss of electric power.
3
Insecure external window, door or lock.
1
Unsafe access path or step.
1
Significant leaks or flooding from water or heating pipes, tanks, cisterns.
1
Loss or partial loss of gas supply.
1
Loss or partial loss of space or water heating where no alternative heating is available.
1
Toilet not flushing where there is no other toilet in the house.
1
Unsafe power or lighting socket, or electrical fitting.
1
Water supply–
loss of water supply;
1
partial loss of water supply.
3
Loose or detached banister or hand rail.
3
Unsafe timber flooring or stair treads.
3
Mechanical extractor fan in internal kitchen or bathroom not working.
7

---
Source: https://www.legislation.gov.uk/ssi/2002/316/schedule (the official version)
Page: https://openlegislation.uk/scottish-secure-tenants-right-to-repair-regulations-2002/schedule
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.