Article 5 Water rights
During the construction of the works, Scottish Water may take from the Abhainn Chro Bheinn, such water as it may require for such construction.
After completion of the works, and when the flow in the Abhainn Chro Bheinn is equal to or greater than 621 cubic metres per day, Scottish Water may, in any day, take from the Abhainn Chro Bheinn, a quantity of water not greater than 181 cubic metres, as measured and recorded by an approved gauge (Work No. 5)
After completion of the works, and when the flow in the Abhainn Chro Bheinn is less than 621 cubic metres per day, Scottish Water shall not, in any day, take water from the Abhainn Chro Bheinn, such as to cause less than 440 cubic metres of water to be discharged into the Abhainn Chro Bheinn, all as regulated by a v notch weir (Work No. 1) and as measured by a staging post (Work No. 2).