# The Scottish Water (Abhainn Chro Bheinn) Water Order 2005, Schedule 1


The works referred to in this Order and shown on the deposited plan are:–
Work No. 1:
Installation of a new weir plate to be affixed to the existing concrete weir at Ordnance Survey National Grid Reference NG 148461 765088.
Work No. 2:
Installation of a new staging post to be fixed to the existing concrete wall at Ordnance Survey National Grid Reference NG 148462 765088.
Work No. 3:
Installation of a new orifice plate to replace the existing weir plate in the existing abstraction chamber at Ordnance Survey National Grid Reference NG 148459 765089.
Work No. 4:
Installation of a new compensation flow upstand pipe.
Work No. 5:
Installation of an approved gauge to measure and record the flow abstracted from the Abhainn Chro Bheinn, to be located in a new water treatment works located at Ordnance Survey National Grid Reference NG 148010 764850 (the construction of which treatment works is not authorised hereunder).

---
Source: https://www.legislation.gov.uk/ssi/2005/513/schedule/1 (the official version)
Page: https://openlegislation.uk/scottish-water-abhainn-chro-bheinn-water-order-2005/schedule-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

