# The Scottish Water (Allt Beithe) Water Order 2005, Schedule 1


The works referred to in this Order and shown on the deposited plan are:–
Work No. 1:
Installation of a new weir plate to be affixed to the existing concrete weir.
Work No. 2:
Installation of a new orifice plate to replace the existing weir plate.
Work No. 3:
Installation of a new staging post to be fixed to the existing concrete weir.
Work No. 4:
Installation of a new 2 inch compensation flow upstand pipe to a level of 119.769 metres above Ordnance Datum.
Work No. 5:
Installation of an approved gauge, to be located in the existing water treatment works located at NGR 166065 776575, to measure and record the flow abstracted from the Allt Beithe.

---