OpenLegislation

Schedule 1

Original text. Later amendments are not shown.

The works referred to in this Order and shown on the deposited plan are–

  • Works No. 1:

    Installation of a staging post, marked at 10 millimetre intervals (referenced to datum on the existing weir sill) within an existing raw water intake structure located at NGR 168345 776681.

  • Works No. 2:

    Installation of a raw water pipeline.

  • Works No. 3:

    Installation of an approved gauge and instrumentation to measure and record the amount of water taken from Loch Bealach na Gaoithe, to be situated within a new water treatment works located at NGR 167286 777228 (the construction of which treatment works is not authorised hereunder).