Schedule 1
The works referred to in this Order and shown on the deposited plan are–
-
Works No. 1:
Installation of a staging post, marked at 10 millimetre intervals (referenced to datum on the existing weir sill) within an existing raw water intake structure located at NGR 168345 776681.
-
Works No. 2:
Installation of a raw water pipeline.
-
Works No. 3:
Installation of an approved gauge and instrumentation to measure and record the amount of water taken from Loch Bealach na Gaoithe, to be situated within a new water treatment works located at NGR 167286 777228 (the construction of which treatment works is not authorised hereunder).