# The Scottish Water (Loch Braigh Horrisdale) Water Order 2006, Schedule 1


The works referred to in this Order and shown on the deposited plan are:–
Works No. 1
Installation of a new intake headstock on the existing intake chamber located at Ordnance Survey National Grid Reference NG 7950 7080; provision of a new rose piece and sluice valve in that chamber; and refurbishment of that chamber and the provision of new covers.
Works No. 2
Installation of a new raw water pipe from the intake chamber to Works No. 3.
Works No. 3
Installation of a new meter chamber and meter to record flows, and the installation of a new swabbing chamber.
Works No. 4
Installation of a new concrete channel within the existing inlet channel; demolition of the existing channel situated downstream and excavation of the loch shoreline to merge into the new channel mouth; and installation of a baffle plate at the new channel mouth and a new stainless steel catch plate.

---
Source: https://www.legislation.gov.uk/ssi/2006/296/schedule/1 (the official version)
Page: https://openlegislation.uk/scottish-water-loch-braigh-horrisdale-water-order-2006/schedule-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

