OpenLegislation

Paragraph 10 Chemical Weapons (Notification) Regulations 1996 (S.I. 1996/2503)

Original text. Later amendments are not shown.

In regulation 3(3)f1 for the words from “Department for” to the end substitute “Department of Energy and Climate Change, NCLU, 3 Whitehall Place, London, SW1A 2HH, or sent by means of an electronic communications network to [email protected]”.

Annotations

Footnotes

f1

Regulation 3(3) was substituted by S.I. 2004/2406, reg. 2 and was amended by S.I. 2007/3224, Sched.