Regulation 9 Maximum time

Original text. Later amendments are not shown.

(1)

The maximum time within which a qualifying repair is to be completed is the number of working days specified in column 2 of the Schedule opposite the defect specified in column 1 of the Schedule.

(2)

The maximum time shall start on the first working day after–

(a)

the date of receipt of notification of the qualifying repair by the landlord; or

(b)

where the landlord inspects the house under regulation 7(a), the date of inspection.