Regulation 9 Maximum time
(1)
The maximum time within which a qualifying repair is to be completed is the number of working days specified in column 2 of the Schedule opposite the defect specified in column 1 of the Schedule.
(2)
The maximum time shall start on the first working day after–
(a)
the date of receipt of notification of the qualifying repair by the landlord; or
(b)
where the landlord inspects the house under regulation 7(a), the date of inspection.