# The Secure Tenants (Right to Repair) (Scotland) Regulations 1994, Schedule: DEFECTS, REPAIRS OF WHICH ARE QUALIFYING REPAIRS AND MAXIMUM TIME FOR COMPLETION


1
2
(Defect)
(Maximum time in working days from date after date of notification of qualifying repair or inspection)
Blocked flue to open fire or boiler
1
Blocked or leaking foul drains, soil stacks, or toilet pans where there is no other toilet in the house.
1
Blocked sink, bath or basins.
1
Electric power–
loss of electric power;
1
partial loss of electric power.
3
Insecure external window, door or lock.
1
Leaks or flooding from water or heating pipes, tanks, cisterns.
1
Loss or partial loss of gas supply.
1
Loss or partial loss of space or water heating where no alternative heating is available.
1
Toilet not flushing where there is no other toilet in the house.
1
Unsafe power or lighting socket, or electrical fitting.
1
Water supply–
loss of water supply;
1
partial loss of water supply.
3
Loose or detached bannister or hand rail.
3
Unsafe timber flooring or stair treads.
3
Mechanical extractor fan in internal kitchen or bathroom not working.
7

---
Source: https://www.legislation.gov.uk/uksi/1994/1046/schedule (the official version)
Page: https://openlegislation.uk/secure-tenants-right-to-repair-scotland-regulations-1994/schedule
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

