# The Severn-Trent Water Authority (Lee Brockhurst Boreholes) Order 1989, Schedule 2: PROVISIONS OF THE THIRD SCHEDULE APPLIED


Provisions applied
Modifications
(1)
(2)
Section 4 (General power to construct subsidiary works)
(i) omit the words “and to any other provisions the special Act limiting the powers of the undertakers to abstract water”.
(ii) for the words “any land for the time being held by them in connection with their water undertaking” substitute “the land described in Schedule 1 to the special Act”;
(iii) after the word “buildings” insert “means of access”.
Part IV (minerals underlying waterworks)
In section 12:–
(i) for the words “after this section is incorporated with their enactments” substitute “under the special Act”;
(ii) for the words “all exisiting pipes or other conduits for the collection, passage, or distribution of water and underground works belonging to them” substitute “all such pipes or other conduits or other underground works”;
(iii) omit the words “for the time being belonging to them”. Section 94 (copies of special Act to be kept by undertakers in their office, and deposited with certain officers) In subsection (1), for the words from “London borough” to the end of the subsection substitute “with the council of every county and district affected by the special Act.”.

---
Source: https://www.legislation.gov.uk/uksi/1989/229/schedule/2 (the official version)
Page: https://openlegislation.uk/severn-trent-water-authority-lee-brockhurst-boreholes-order-1989/schedule-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

