# The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm (Amendment) Order 2025, Article 4: Amendments to Part 1 (requirements) of Schedule 2


In paragraph 2 of Part 1 (requirements) of Schedule 2—
(a) in sub-paragraph 1(d)—
(i) omit “have a distance of less than 30 metres between the lowest point of the rotating blade of the wind turbine generator and HAT;” and
(ii) insert “not used;”
(b) delete sub-paragraph (2) and insert—
“(2) Within Work No. 1A—
(a) The total rotor swept area must not exceed 1.42 square kilometres; and
(b) the total rotor-swept area and the corresponding air gap for each wind turbine generator must accord with the parameters specified below—
Where the Total Rotor-Swept Area is
Minimum Air Gap (m)
1.01km2 or less
30
Greater than 1.01km2 and up to 1.13km2
31
Greater than 1.13km2 and up to 1.42km 2
32
”.
(c) delete paragraph (3) and insert—
“(3) Within Work No. 1B—
(a) The total rotor swept area must not exceed 1.85 square kilometres; and
(b) the total rotor-swept area and the corresponding air gap for each wind turbine generator must accord with the parameters specified below—
Where the Total Rotor-Swept Area is
Minimum Air Gap (m)
1.31km2 or less
30
Greater than 1.31km2 and up to 1.47km2
31
Greater than 1.47km2 and up to 1.85km 2
32
”.

---
Source: https://www.legislation.gov.uk/uksi/2025/145/article/4 (the official version)
Page: https://openlegislation.uk/sheringham-shoal-and-dudgeon-extensions-offshore-wind-farm-amendment-order-2025/article-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.