{
  "url": "https://openlegislation.uk/sheringham-shoal-and-dudgeon-extensions-offshore-wind-farm-order-2024/schedule-12/part-2/paragraph-1",
  "json_url": "https://openlegislation.uk/sheringham-shoal-and-dudgeon-extensions-offshore-wind-farm-order-2024/schedule-12/part-2/paragraph-1.json",
  "legislation": "uksi/2024/564",
  "legislation_title": "The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024",
  "legislation_url": "https://openlegislation.uk/sheringham-shoal-and-dudgeon-extensions-offshore-wind-farm-order-2024",
  "path": "schedule/12/part/2/paragraph/1",
  "kind": "paragraph",
  "number": "1",
  "heading": "Design parameters",
  "text": "Offshore Substation Platform\n(1) The dimensions of the offshore substation platform in Work No. 3A or 3C (excluding towers, masts and cranes) must not exceed—\n(a) 70 metres in length;\n(b) 40 metres in width; or\n(c) 50 metres in height above HAT.\n(2) Offshore substation platform foundation in Work No. 3A or 3C must be of one of the following foundation options: piled jacket or suction bucket jacket.\n(3) The offshore substation platform foundation in Work No. 3A or 3C must not—\n(a) have more than four legs;\n(b) have more than eight piles;\n(c) have a pile diameter exceeding 3.5 metres;\n(d) employ a hammer energy during installation exceeding 3,000 kilojoules;\n(e) have a seabed footprint (excluding subsea scour protection) exceeding 452 square metres; or\n(f) have a seabed footprint (including subsea scour protection) exceeding 4,761 square metres.\n(4) The total amount of scour protection for the offshore substation platform in Work No. 3A or 3C must not exceed 4,054 square metres.\n(5) The total volume of scour protection for the offshore substation platform in Work No. 3A or 3C must not exceed 7297 cubic metres.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 12 Pt. 2 para. 1 in force at 9.5.2024, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/564/schedule/12/part/2/paragraph/1",
    "retrieved_at": "2026-10-28T21:30:20.840898+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}