# The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024, Paragraph 3

Extent: E+W

Such activities are authorised in relation to the construction, maintenance and operation of—
Work No. 3B—in the event of scenario 1, scenario 2 or scenario 3, an offshore substation platform fixed to the seabed by either piled jacket or suction bucket jacket foundations within the area shown on the works plans; or
Work No. 3C—in the event of scenario 4, an integrated offshore substation platform fixed to the seabed by either piled jacket or suction bucket jacket foundations within the area shown on the works plans;
Work No. 4B—in the event of scenario 1, scenario 2 or scenario 3—
(a) interlink cables between DEP North and DEP South within the areas shown on the works plans; and
(b) HVAC subsea export cables between Work No. 3B and Work No. 5B along routes within the area shown on the works plans including cable protection and one or more cable crossings; or
Work No. 4C— in the event of scenario 4—
(c) interlink cables between DEP North and Work No. 3C and DEP South and Work No. 3C; and
(d) HVAC subsea export cables between Work No. 3C and Work No. 5C along routes within the area shown on the works plans including cable protection and one or more cable crossings;
Work No. 5B— in the event of scenario 1, scenario 2 or scenario 3, HVAC subsea export cables between Work No. 4B and Work No. 7B along routes within the area shown on the works plans including cable protection and one or more cable crossings; or
Work No. 5C— in the event of scenario 4, HVAC subsea export cables between Work No. 4C and Work No. 7C along routes within the area shown on the works plans including cable protection and one or more cable crossings;
Work No. 6B— in the event of scenario 1, scenario 2 or scenario 3, a temporary work area for vessels to carry out intrusive activities and non-intrusive activities alongside Work Nos. 1B, 2B, 3B, 4B and 5B; or
Work No. 6C— in the event of scenario 4, a temporary work area for vessels to carry out intrusive activities and non-intrusive activities alongside Work Nos. 1B, 2B, 3C, 4C and 5C;
Work No. 7B— in the event of scenario 1, scenario 2 or scenario 3, landfall connection works between Work No. 5B and Work No. 8B comprising of a cable circuit and ducts seaward of MHWS within the area shown on the works plans; or
Work No. 7C— in the event of scenario 4, landfall connection works between Work No. 5C and Work No. 8C comprising of up to two cable circuits and ducts seaward of MHWS within the area shown on the works plans;

---
Source: https://www.legislation.gov.uk/uksi/2024/564/schedule/13/part/1/paragraph/3 (the official version)
Page: https://openlegislation.uk/sheringham-shoal-and-dudgeon-extensions-offshore-wind-farm-order-2024/schedule-13/part-1/paragraph-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.