# The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024, Schedule 18: Documents to be certified

Extent: E+W

The following documents in Table 1 are the list referred to in article 37—
Table 1
Document Number
Examination Library Reference
Name
Version
Date
2.3
REP7-002
Land Plans
E
July 2023
2.4
Post examination
Crown Land Plan
E
December 2023
2.5
REP3-004
Special Category Land Plan
C
May 2023
2.6
AS-050
Works Plans (Onshore)
D
April 2023
2.7
REP8-003
Works Plans (Offshore)
D
July 2023
2.8
APP-013
Offshore Order Limits
and Grid Coordinates Plan
A
September 2022
2.9
REP5-002
Access to Works Plan
E
June 2023
2.10
REP5-003
Streets (to be temporarily stopped up) Plan
D
June 2023
2.11
REP5-004
Public Rights of Way (to
be temporarily stopped up) Plan
E
June 2023
2.12
AS-053
Tree Preservation Order and Hedgerow Plan
C
April 2023
4.1
Post examination
Book of Reference
I
December 2023
5.5.2.1
REP7-017
Habitats Regulations Derogation Provision of Evidence, Annex 2A - Outline Sandwich Tern Compensation Implementation and Monitoring Plan
B
July 2023
5.5.3.1
APP-073
Habitats Regulations Derogation Provision of Evidence, Annex 3A - Outline Kittiwake Compensation Implementation and
Monitoring Plan
A
September 2022
Environmental Statement
6.1.1
APP-087
Environmental Statement Chapter 1 - Introduction
A
September 2022
6.1.2
APP-088
Environmental Statement Chapter 2 - Policy and Legislative Context
A
September 2022
6.1.3
APP-089
Environmental Statement Chapter 3 - Site Selection & Assessment of Alternatives
A
September 2022
6.1.4
REP5-021
Environmental Statement Chapter 4 - Project Description
C
June 2023
6.1.5
APP-091
Environmental Statement Chapter 5 - EIA Methodology
A
September 2022
6.1.6
APP-092
Environmental Statement Chapter 6 - Marine Geology, Oceanography and Physical Processes
A
September 2022
6.1.7
APP-093
Environmental Statement Chapter 7 - Marine Water and Sediment Quality
A
September 2022
6.1.8
APP-094
Environmental Statement Chapter 8 - Benthic Ecology
A
September 2022
6.1.9
APP-095
Environmental Statement Chapter 9 - Fish and Shellfish Ecology
A
September 2022
6.1.10
APP-096
Environmental Statement Chapter 10 - Marine Mammal Ecology
A
September 2022
6.1.11
APP-097
Environmental Statement Chapter 11 - Offshore Ornithology
A
September 2022
6.1.12
APP-098
Environmental Statement Chapter 12 - Commercial Fisheries
A
September 2022
6.1.13
APP-099
Environmental Statement Chapter 13 – Shipping Navigation
A
September 2022
6.1.14
APP-100
Environmental Statement Chapter 14 – Offshore Archaeology and Cultural Heritage
A
September 2022
6.1.15
APP-101
Environmental Statement Chapter 15 - Aviation and Radar
A
September 2022
6.1.16
APP-102
Environmental Statement Chapter 16 – Petroleum Industry and Other Marine Users
A
September 2022
6.1.17
APP-103
Environmental Statement Chapter 17 - Ground Conditions and Contamination
A
September 2022
6.1.18
APP-104
Environmental Statement Chapter 18 – Water Resources and Flood Risk
A
September 2022
6.1.19
REP2-022
Environmental Statement Chapter 19 - Land Use, Agriculture and Recreation
B
March 2023
6.1.20
REP3-026
Environmental Statement Chapter 20 – Onshore Ecology and Ornithology
C
May 2023
6.1.21
APP-107
Environmental Statement Chapter 21 – Onshore Archaeology and Cultural Heritage
A
September 2022
6.1.22
APP-108
Environmental Statement Chapter 22 - Air Quality
A
September 2022
6.1.23
APP-109
Environmental Statement Chapter 23 - Noise and Vibration
A
September 2022
6.1.24
APP-110
Environmental Statement Chapter 24 - Traffic and Transport
A
September 2022
6.1.25
APP-111
Environmental Statement Chapter 25 - Seascape and Visual Impact Assessment
A
September 2022
6.1.26
APP-112
Environmental Statement Chapter 26 – Landscape and Visual Impact Assessment
A
September 2022
6.1.27
APP-113
Environmental Statement Chapter 27 - Socio- Economics and Tourism
A
September 2022
6.1.28
APP-114
Environmental Statement Chapter 28 - Health
A
September 2022
6.1.29
APP-115
Environmental Statement Chapter 29 - Transboundary Impacts
A
September 2022
6.2.3
APP-116
Environmental Statement Chapter 3 Figures – Site Selection and Assessment of Alternatives
A
September 2022
6.2.4
REP3-028
Environmental Statement Chapter 4 Figures - Project Description
B
May 2023
6.2.5
APP-118
Environmental Statement Chapter 5 Figures – EIA Methodology
A
September 2022
6.2.6
APP-119
Environmental Statement Chapter 6 Figures - Marine Geology, Oceanography and Physical Processes
A
September 2022
6.2.7
APP-120
Environmental Statement Chapter 7 Figures - Marine Water and Sediment Quality
A
September 2022
6.2.8
APP-121
Environmental Statement Chapter 8 Figures - Benthic Ecology
A
September 2022
6.2.9
APP-122
Environmental Statement Chapter 9 Figures – Fish and Shellfish Ecology
A
September 2022
6.2.11
APP-123
Environmental Statement Chapter 11 Figures - Offshore Ornithology
A
September 2022
6.2.12
APP-124
Environmental Statement Chapter 12 Figures - Commercial Fisheries
A
September 2022
6.2.13
APP-125
Environmental Statement Chapter 13 Figures - Shipping Navigation
A
September 2022
6.2.14
APP-126
Environmental Statement Chapter 14 Figures - Offshore Archaeology and Cultural Heritage
A
September 2022
6.2.15
APP-127
Environmental Statement Chapter 15 Figures - Aviation and Radar
A
September 2022
6.2.16
APP-128
Environmental Statement Chapter 16 Figures - Petroleum Industry and other Marine Users
A
September 2022
6.2.18
APP-129
Environmental Statement Chapter 18 Figures - Water Resources and Flood Risk
A
September 2022
6.2.19
REP6-005
Environmental Statement Chapter 19 Figures - Land Use, Agriculture and Recreation
C
June 2023
6.2.20
APP-131
Environmental Statement Chapter 20 Figures - Onshore Ecology and Ornithology
A
September 2022
6.2.22
APP-132
Environmental Statement Chapter 22 Figures - Air Quality
A
September 2022
6.2.23
APP-133
Environmental Statement Chapter 23 Figures - Noise and Vibration
A
September 2022
6.2.24
APP-134
Environmental Statement Chapter 24 Figures - Traffic and Transport
A
September 2022
6.2.25
APP-135
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 1 of 18
A
September 2022
6.2.25
APP-136
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 2 of 18
A
September 2022
6.2.25
APP-137
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 3 of 18
A
September 2022
6.2.25
APP-138
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 4 of 18
A
September 2022
6.2.25
APP-139
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 5 of 18
A
September 2022
6.2.25
APP-140
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 6 of 18
A
September 2022
6.2.25
APP-141
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 7 of 18
A
September 2022
6.2.25
APP-142
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 8 of 18
A
September 2022
6.2.25
APP-143
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 9 of 18
A
September 2022
6.2.25
APP-144
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 10 of 18
A
September 2022
6.2.25
APP-145
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 11 of 18
A
September 2022
6.2.25
APP-146
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 12 of 18
A
September 2022
6.2.25
APP-147
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 13 of 18
A
September 2022
6.2.25
APP-148
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 14 of 18
A
September 2022
6.2.25
APP-149
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 15 of 18
A
September 2022
6.2.25
APP-150
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 16 of 18
A
September 2022
6.2.25
APP-151
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 17 of 18
A
September 2022
6.2.25
APP-152
Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 18 of 18
A
September 2022
6.2.26
APP-153
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 1 of 20
A
September 2022
6.2.26
APP-154
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 2 of 20
A
September 2022
6.2.26
APP-155
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 3 of 20
A
September 2022
6.2.26
APP-156
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 4 of 20
A
September 2022
6.2.26
APP-157
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 5 of 20
A
September 2022
6.2.26
APP-158
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 6 of 20
A
September 2022
6.2.26
APP-159
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 7 of 20
A
September 2022
6.2.26
APP-160
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 8 of 20
A
September 2022
6.2.26
APP-161
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 9 of 20
A
September 2022
6.2.26
APP-162
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment - Part 10 of 20
A
September 2022
6.2.26
APP-163
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 11 of 20
A
September 2022
6.2.26
APP-164
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 12 of 20
A
September 2022
6.2.26
APP-165
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 13 of 20
A
September 2022
6.2.26
APP-166
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 14 of 20
A
September 2022
6.2.26
APP-167
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 15 of 20
A
September 2022
6.2.26
APP-168
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 16 of 20
A
September 2022
6.2.26
APP-169
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 17 of 20
A
September 2022
6.2.26
APP-170
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment - Part 18 of 20
A
September 2022
6.2.26
APP-171
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 19 of 20
A
September 2022
6.2.26
APP-172
Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment - Part 20 of 20
A
September 2022
6.2.27
APP-173
Environmental Statement Chapter 27 Figures – Socio-Economics and Tourism
A
September 2022
6.2.28
APP-174
Environmental Statement Chapter 28 Figures - Health
A
September 2022
6.3.21.1.3
APP-230b
Environmental Statement - Figures
A
September 2022
6.3.21.2.2
APP-234
Environmental Statement Annex 21.2.2 - Figures to Appendix 21.2
A
September 2022
6.3.21.4.2
APP-238
Environmental Statement Annex 21.4.2 - Onshore Substation Setting Assessment Figures
A
September 2022
6.3.21.5.2
APP-241
Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 1 of 12
A
September 2022
6.3.21.5.2
APP-242
Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 2 of 12
A
September 2022
6.3.21.5.2
APP-243
Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 3 of 12
A
September 2022
6.3.21.5.2
APP-244
Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 4 of 12
A
September 2022
6.3.21.5.2
APP-245
Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 5 of 12
A
September 2022
6.3.21.5.2
APP-246
Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures - Part 6 of 12
A
September 2022
6.3.21.5.2
APP-247
Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 7 of 12
A
September 2022
6.3.21.5.2
APP-248
Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures - Part 8 of 12
A
September 2022
6.3.21.5.2
APP-249
Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures - Part 9 of 12
A
September 2022
6.3.21.5.2
APP-250
Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures - Part 10 of 12
A
September 2022
6.3.21.5.2
APP-251
Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 11 of 12
A
September 2022
6.3.21.5.2
APP-252
Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 12 of 12
A
September 2022
6.3.3.1
APP-175
Environmental Statement Appendix 3.1 – Onshore Substation Site Selection Report
A
September 2022
6.3.3.2
APP-176
Environmental Statement Appendix 3.2 - Cable Landfall Concept Study
A
September 2022
6.3.3.3
APP-177
Environmental Statement Appendix 3.3. – Onshore Main Construction Compound Site Selection Report
A
September 2022
6.3.4.1
REP7-024
Environmental Statement Appendix 4.1 – Crossing Schedule
E
July 2023
6.3.4.2
APP-179
Environmental Statement Appendix 4.2 - Greenhouse Gas Footprint Assessment
A
September 2022
6.3.6.1
APP-180
Environmental Statement Appendix 6.1 - Physical Processes Method Statement
A
September 2022
6.3.6.2
APP-181
Environmental Statement Appendix 6.2 – Wave Climate Assessment
A
September 2022
6.3.6.3
APP-182
Environmental Statement Appendix 6.3 - Sedimentary Processes in the Cromer Shoal Chalk Beds MCZ
A
September 2022
6.3.6.4
APP-183
Environmental Statement Appendix 6.4 - Sheringham Shoal Nearshore Cable Route - BGS Shallow Geological Assessment
A
September 2022
6.3.8.1
APP-184
Environmental Statement Appendix 8.1 - DEP Benthic Characterisation Report
A
September 2022
6.3.8.2
APP-185
Environmental Statement Appendix 8.2 - SEP Benthic Characterisation Report
A
September 2022
6.3.8.3
APP-186
Environmental Statement Appendix 8.3 - DEP Benthic Habitat Report
A
September 2022
6.3.8.4
APP-187
Environmental Statement Appendix 8.4 – SEP Benthic Habitat Report
A
September 2022
6.3.8.5
APP-188
Environmental Statement Appendix 8.5 - DEP and SEP Benthic Habitat Mapping
A
September 2022
6.3.8.6
APP-189
Environmental Statement Appendix 8.6 – MarESA Biotope Sensitivities
A
September 2022
6.3.9.1
APP-190
Environmental Statement Appendix 9.1 - Fish and Shellfish Ecology Technical Report
A
September 2022
6.3.10.1
APP-191
Environmental Statement Appendix 10.1 – Marine Mammal Consultation Responses, Information and Survey Data
A
September 2022
6.3.10.2
REP8-019
Environmental Statement Appendix 10.2 - Underwater Noise Modelling Report
C
July 2023
6.3.10.3
APP-193
Environmental Statement Appendix 10.3 - Marine Mammal Cumulative Impact Assessment (CIA) Screening
A
September 2022
6.3.10.4
APP-194
Environmental Statement Appendix 10.4 - Marine Mammal Unexploded Ordnance (UXO) Assessment
A
September 2022
6.3.11.1
APP-195
Environmental Statement Appendix 11.1 - Offshore Ornithology Technical Report
A
September 2022
6.3.11.2
APP-196
Environmental Statement Appendix 11.2 - Information to Inform the Offshore Ornithology Cumulative Impact Assessment
A
September 2022
6.3.12.1
APP-197
Environmental Statement Appendix 12.1 - Commercial Fisheries Technical Report
A
September 2022
6.3.13.1
APP-198
Environmental Statement Appendix 13.1 - Navigation Risk Assessment
A
September 2022
6.3.14.1
APP-199
Environmental Statement Appendix 14.1 - Archaeological Assessment of Geophysical Data
A
September 2022
6.3.14.2
APP-200
Environmental Statement Appendix 14.2 - Archaeological Assessment of Geophysical Data - Addendum
A
September 2022
6.3.14.3
APP-201
Environmental Statement Appendix 14.3 - Stage 1 Archaeological Assessment of Geophysical Data
A
September 2022
6.3.15.1
APP-202
Environmental Statement Appendix 15.1 - Technical Report including Radar Line of Sight Images
A
September 2022
6.3.15.2
APP-203
Environmental Statement Appendix 15.2 - Surveillance Minimum Altitude Chart Analysis
A
September 2022
6.3.16.1
APP-204
Environmental Statement Appendix 16.1 – Vessel Access Study
A
September 2022
6.3.16.2
APP-205
Environmental Statement Appendix 16.2 - Helicopter Access Study
A
September 2022
6.3.17.1
REP3-032
Environmental Statement Appendix 17.1 - Land Quality Desk Study and Preliminary Risk Assessment Report
B
May 2023
6.3.17.2
APP-207
Environmental Statement Appendix 17.2 - Waste Assessment (Onshore Development)
A
September 2022
6.3.18.1
REP3-034
Environmental Statement Appendix 18.1 - Water Framework Directive Compliance Assessment
B
May 2023
6.3.18.2
AS-023-AS-030
Environmental Statement Appendix 18.2 - Flood Risk Assessment
B
October 2022
6.3.18.2.1
REP3-036
Environmental Statement Appendix 18.2.1 – Annex 18.2.1 – Onshore Substation Drainage Study
C
May 2023
6.3.18.3
REP3-038
Environmental Statement Appendix 18.3 – Geomorphological Baseline Survey Technical Report
B
May 2023
6.3.19.1
REP5-023
Environmental Statement Appendix 19.1 – Public Right of Way and Cycle Route Crossings
B
June 2023
6.3.20.1
REP3-040
Environmental Statement Appendix 20.1 - Extended Phase 1 Habitat Survey Report
B
May 2023
6.3.20.2
REP3-042
Environmental Statement Appendix 20.2 - Great Crested Newt Survey Report
B
May 2023
6.3.20.3
APP-216
Environmental Statement Appendix 20.3 - Bat Activity Survey Report
A
September 2022
6.3.20.4
REP3-044
Environmental Statement Appendix 20.4 - Wintering Birds Survey Report
B
May 2023
6.3.20.5
REP3-046
Environmental Statement Appendix 20.5 – Breeding Birds Survey Report
B
May 2023
6.3.20.6
REP3-048
Environmental Statement Appendix 20.6 – Initial Biodiversity Net Gain Assessment
B
May 2023
6.3.20.7
REP3-050
Environmental Statement Appendix 20.7 - Onshore Ecology Desk Study
B
May 2023
6.3.20.8
APP-221
Environmental Statement Appendix 20.8 – Reptile Survey Report
A
September 2022
6.3.20.9
REP3-052
Environmental Statement Appendix 20.9 – White Clawed Crayfish Survey Report
B
May 2023
6.3.20.10
APP-223
Environmental Statement Appendix 20.10 - Bat (Roosting) Survey Report
A
September 2022
6.3.20.11
APP-224
Environmental Statement Appendix 20.11 - Invertebrate Survey Report
A
September 2022
6.3.20.12
APP-225
Environmental Statement Appendix 20.12 - National Vegetation Classification (NVC) Survey Report
A
September 2022
6.3.20.13
REP3-054
Environmental Statement Appendix 20.13 - Riparian Mammals (Water Vole and Otter) Survey Report
B
May 2023
6.3.20.14
APP-227
Environmental Statement Appendix 20.14 - Badger Confidential Appendix
A
September 2022
6.3.20.15
APP-228
Environmental Statement Appendix 20.15 - Arboricultural Survey Report
A
September 2022
6.3.21.1
APP-229
Environmental Statement Appendix 21.1 - Onshore Archaeological Desk- Based (Baseline) Assessment
A
September 2022
6.3.21.1.1
APP-230
Environmental Statement Appendix 21.1.1 - Designated Heritage Assets
A
September 2022
6.3.21.1.2
APP-230a
Environmental Statement - Non-designated Heritage Assets
A
September 2022
6.3.21.1.4
APP-231
Environmental Statement Appendix 21.1.4 - Heritage Site Walkover Survey
A
September 2022
6.3.21.2
APP-232
Environmental Statement Appendix 21.2 - Aerial Photographic, LiDAR Data and Historic Map Regression Analysis
A
September 2022
6.3.21.2.1
APP-233
Environmental Statement Appendix 21.2 – Annex 21.2.1 - Metadata to Appendix 21.2
A
September 2022
6.3.21.3
APP-235
Environmental Statement Appendix 21.3 - Aerial Photography and Historic Map Regression Addendum
A
September 2022
6.3.21.4
APP-236
Environmental Statement Appendix 21.4 – Onshore Substation Setting Assessment
A
September 2022
6.3.21.4.1
APP-237
Environmental Statement Appendix 21.4 – Annex 21.4.1 - Onshore Substation Setting Assessment Screening Tables
A
September 2022
6.3.21.5
APP-239
Environmental Statement Appendix 21.5 - Offshore Infrastructure Setting Assessment
A
September 2022
6.3.21.5.1
APP-240
Environmental Statement Appendix 21.5.1 – Annex 21.5.1 - Offshore Infrastructure Setting Assessment Screening Tables
A
September 2022
6.3.21.6
APP-253
Environmental Statement Appendix 21.6 - Priority Archaeological Geophysical Survey (Part 1 of 5)
A
September 2022
6.3.21.6
APP-254
Environmental Statement Appendix 21.6 - Priority Archaeological Geophysical Survey (Part 2 of 5)
A
September 2022
6.3.21.6
APP-255
Environmental Statement Appendix 21.6 - Priority Archaeological Geophysical Survey (Part 3 of 5)
A
September 2022
6.3.21.6
APP-256
Environmental Statement Appendix 21.6 - Priority Archaeological Geophysical Survey (Part 4 of 5)
A
September 2022
6.3.21.6
APP-257
Environmental Statement Appendix 21.6 – Priority Archaeological Geophysical Survey (Part 5 of 5)
A
September 2022
6.3.21.7
APP-258
Environmental Statement Appendix 21.7 - Archaeological and Geoarchaeological Monitoring Assessment
A
September 2022
6.3.22.1
APP-259
Environmental Statement Appendix 22.1 - Construction Dust and Fine Particulate Matter Assessment Methodology
A
September 2022
6.3.22.2
APP-260
Environmental Statement Appendix 22.2 – Air Quality Assessment Traffic Data
A
September 2022
6.3.22.3
APP-261
Environmental Statement Appendix 22.3 - Air Quality Background Pollutant Concentrations
A
September 2022
6.3.22.4
APP-262
Environmental Statement Appendix 22.4 - Designated Ecological Sites and Critical Level and Load Values in the Air Quality Study Area
A
September 2022
6.3.22.5
APP-263
Environmental Statement Appendix 22.5 - Air Quality Ecological Receptor Assessment Tables
A
September 2022
6.3.23.1
APP-264
Environmental Statement Appendix 23.1 – Baseline Noise Survey
A
September 2022
6.3.23.2
APP-265
Environmental Statement Appendix 23.2 - Road Traffic Noise Assessment
A
September 2022
6.3.23.3
APP-266
Environmental Statement Appendix 23.3 - Construction Noise Assessment
A
September 2022
6.3.23.4
APP-267
Environmental Statement Appendix 23.4 – Onshore Substation Operational Noise Assessment
A
September 2022
6.3.24.1
APP-268
Environmental Statement Appendix 24.1 - Transport Assessment
A
September 2022
6.3.24.1.1
APP-269
Environmental Statement Appendix 24.1.1 - Transport Assessment Annexes
A
September 2022
6.3.24.2
APP-270
Environmental Statement Appendix 24.2 - Abnormal Indivisible Load (AIL) Study
A
September 2022
6.3.24.3
APP-271
Environmental Statement Appendix 24.3 - Pedestrian Delay Assessment
A
September 2022
6.3.24.4
APP-272
Environmental Statement Appendix 24.4 - Cumulative Traffic Flows
A
September 2022
6.3.24.5
APP-273
Environmental Statement Appendix 24.5 - Interaction Between Impacts
A
September 2022
6.3.25.1
APP-274
Environmental Statement Appendix 25.1 – Seascape and Visual Impact Assessment Annexes
A
September 2022
6.3.26.1
APP-275
Environmental Statement Appendix 26.1 - Landscape and Visual Impact Assessment Annexes
A
September 2022
6.3.27.1
APP-276
Environmental Statement Appendix 27.1 – Socio- Economics Construction Costs and Sourcing Assumptions Note
A
September 2022
6.3.27.2
APP-277
Environmental Statement Appendix 27.2 – Socio- Economics and Tourism Technical Baseline
A
September 2022
6.3.27.3
APP-278
Environmental Statement Appendix 27.3 – Socio- Economics Impact Assessment
A
September 2022
6.3.28.1
Post-examination
Environmental Statement Appendix 28.1 - Sheringham and Dudgeon Extension Projects EMF Assessment
B
July 2024
6.3.28.2
APP-280
Environmental Statement Appendix 28.2 - Health Baseline Statistics
A
September 2022
6.5
REP8-021
Schedule of Mitigation and Mitigation Route Map
B
July 2023
13.2
REP3-089
Collision Risk Modelling (CRM) Updates (EIA Context) Technical Note
B
May 2023
13.5
REP3-093
Marine Processes Technical Note (Revision B) (Clean)
B
May 2023
14.28
REP2-049
Auk Construction Phase Displacement Assessment (EIA Context) Technical Note
A
March 2023
14.31
REP3-097
Addendum to the Flood Risk Assessment
B
May 2023
14.32
REP2-053
Addendum to Environmental Statement Chapter 20 Onshore Ecology and Ornithology
A
March 2023
14.34
REP5-045
Onshore Substation Hydraulic Modelling Report
C
June 2023
16.14
REP7-056
Marine Mammals Technical Note and Addendum
B
July 2023
17.2
AS-063
Supplemental Environmental Information to support the Applicant’s material change request
A
April 2023
19.21
REP5-063
Gannet and Auk Cumulative Displacement Updates Technical Note
A
June 2023
Other documents
9.3
REP3-056
Design and Access Statement
B
May 2023
9.4
REP1-013
Draft Marine Mammal Mitigation Protocol
B
February 2023
9.5
REP7-029
Offshore in Principle Monitoring Plan
C
July 2023
9.6
APP-290
In Principle Site Integrity Plan for the Southern North Sea Special Area of Conservation
A
September 2022
9.7
REP7-031
Outline Cromer Shoal Chalk Beds Marine Conservation Zone Cable Specification, Installation And Monitoring Plan
B
July 2023
9.8
REP7-033
Outline Fisheries Liaison and Co-existence Plan
B
July 2023
9.9
REP3-058
Outline Offshore Operations and Maintenance Plan
C
May 2023
9.10
REP7-035
Outline Project Environmental Management Plan
D
July 2023
9.11
APP-298
Outline Written Scheme of Investigation (Offshore)
A
September 2022
9.12
APP-299
Outline Marine Traffic Monitoring Plan
A
September 2022
9.16
REP5-027
Outline Construction Traffic Management Plan
D
June 2023
9.17
REP8-023
Outline Code of Construction Practice
G
July 2023
9.18
REP5-031
Outline Landscape Management Plan
D
June 2023
9.19
Post examination
Outline Ecological Management Plan
F
December 2023
9.20
REP3-070
Outline Operational Drainage Strategy ...
C
May 2023
9.21
REP2-031
Outline Written Scheme of Investigation (Onshore)
C
March 2023
9.22
APP-309
Outline Public Rights of Way Strategy
A
September 2022
9.23
REP3-072
Outline Skills and Employment Plan
B
May 2023
. . .
. . .
. . .
. . .
. . .

---
Source: https://www.legislation.gov.uk/uksi/2024/564/schedule/18 (the official version)
Page: https://openlegislation.uk/sheringham-shoal-and-dudgeon-extensions-offshore-wind-farm-order-2024/schedule-18
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.