  "url": "https://openlegislation.uk/sheringham-shoal-and-dudgeon-extensions-offshore-wind-farm-order-2024/schedule-2/part-1/paragraph-2/enacted",
  "json_url": "https://openlegislation.uk/sheringham-shoal-and-dudgeon-extensions-offshore-wind-farm-order-2024/schedule-2/part-1/paragraph-2/enacted.json",
  "legislation": "uksi/2024/564",
  "legislation_title": "The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024",
  "legislation_url": "https://openlegislation.uk/sheringham-shoal-and-dudgeon-extensions-offshore-wind-farm-order-2024/enacted",
  "path": "schedule/2/part/1/paragraph/2",
  "kind": "paragraph",
  "number": "2",
  "heading": "Detailed offshore design parameters",
  "text": "Wind turbine generator dimensions\n(1) Subject to sub-paragraph ‎(4), wind turbine generators forming part of the authorised project must not—\n(a) exceed a height of 330 metres when measured from HAT to the tip of the vertical blade;\n(b) exceed a rotor diameter of 300 metres;\n(c) be less than 1.05 kilometres from the nearest wind turbine generator in any direction;\n(d) not used;\n(e) exceed 23 wind turbine generators in respect of the Sheringham Shoal Extension Project offshore works; or\n(f) exceed 30 wind turbine generators in respect of the Dudgeon Extension Project offshore works.\n(2) Within Work No. 1A—\n(a) The total rotor swept area must not exceed 1.42 square kilometres; and\n(b) the total rotor-swept area and the corresponding air gap for each wind turbine generator must accord with the parameters specified below—\nWhere the Total Rotor-Swept Area isMinimum Air Gap (m)\n1.01km2 or less30\nGreater than 1.01km2 and up to 1.13km231\nGreater than 1.13km2 and up to 1.42km 232\n(3) Within Work No. 1B—\n(a) The total rotor swept area must not exceed 1.85 square kilometres; and\n(b) the total rotor-swept area and the corresponding air gap for each wind turbine generator must accord with the parameters specified below—\nWhere the Total Rotor-Swept Area isMinimum Air Gap (m)\n1.31km2 or less30\nGreater than 1.31km2 and up to 1.47km231\nGreater than 1.47km2 and up to 1.85km 232\n(4) References to the location of a wind turbine generator are references to the centre point at the base of the wind turbine generator.",
  "extent": "E+W",
  "status": null,
  "version": "enacted",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 2 para. 2(1)(d) substituted (7.2.2025) by virtue ofvirtue ofThe Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm (Amendment) Order 2025 (S.I. 2025/145), arts. 1, 4(a)(ii)"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Sch. 2 para. 2(2) substituted (7.2.2025) by virtue of The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm (Amendment) Order 2025 (S.I. 2025/145), arts. 1, 4(b)"
    },
    {
      "type": "F",
      "label": "F3",
      "text": "Sch. 2 para. 2(3) substituted (7.2.2025) by virtue of The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm (Amendment) Order 2025 (S.I. 2025/145), arts. 1, 4(c)"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 Pt. 1 para. 2 in force at 9.5.2024, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/564/schedule/2/part/1/paragraph/2",
    "retrieved_at": "2026-10-28T21:30:20.840898+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}