# The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024, Paragraph 3

Extent: E+W

Wind turbine generator foundations
(1) Wind turbine generator foundations must be of one or more of the following foundation options: piled monopile, suction bucket monopile, piled jacket, suction bucket jacket or gravity base structure foundation.
(2) No wind turbine generator piled monopile or suction bucket monopile foundation may have a pile diameter exceeding 16 metres.
(3) No wind turbine generator gravity base structure foundation may—
(a) have a seabed base plate exceeding 60 metres in diameter; or
(b) have a gravel footing exceeding 62 metres in diameter.
(4) No wind turbine generator piled jacket or suction bucket jacket foundation may—
(a) have more than four legs;
(b) have more than four piles; or
(c) have a pile diameter exceeding four metres.

---
Source: https://www.legislation.gov.uk/uksi/2024/564/schedule/2/part/1/paragraph/3 (the official version)
Page: https://openlegislation.uk/sheringham-shoal-and-dudgeon-extensions-offshore-wind-farm-order-2024/schedule-2/part-1/paragraph-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.