(a) Every winch, and every derrick with the whole of the gear accessory thereto, shall be tested with a proof load which shall not be less than the following—
Safe working load
Proof load
Under 20 tons
25 per cent.
in excess of the safe working load
20–50 tons
5 tons
over 50 tons
10 per cent.
In the case of a derrick with its accessory gear the proof load shall be applied as follows:—
(i) where reasonably practicable by hoisting movable weights; or
(ii) in other cases by maintaining the load by means of an accurate spring or hydraulic balance or similar device for a period of not less than five minutes. Where movable test weights are used the derrick shall be swung, with the load suspended, as far as possible in both directions. Where a spring or hydraulic balance or similar device is employed it shall be sufficient if the proof load is applied with the derrick swung as far as practicable first in one direction and then in the other. In each case the derrick shall be tested at the smallest angle to the horizontal at which it will operate and this angle shall be stated in the certificate of the test.
(b) Every crane, crab, sheer-legs, teagle, transporter or runway, with its accessory gear, shall be tested with a proof load which shall not be less than the following—
Safe working load
Proof load
Under 20 tons
25 per cent.
in excess of the safe working load
20–50 tons
5 tons
over 50 tons
10 per cent.
In the case of a crane having a variable radius it shall be tested with a proof load applied at the maximum and minimum working radii. At each such radius the crane shall be swung as far as possible in both directions with the corresponding proof load suspended. In the case of hydraulic cranes where, owing to the limitation of pressure it is impossible to hoist a load 25 per cent. in excess of the safe working load, it shall be sufficient to hoist the greatest possible load.
(c) Every article of lifting gear (whether it is accessory to any lifting appliance or not) and every pulley block other than a pulley block specially constructed for use with a crane to which it is permanently attached, and every chain shall be tested with a proof load at least equal to that shown against it in the following table:—
Article of gear
Safe working load
Proof load
Chain sling
Twice the safe working load
Rope sling
Plate clamp
Ring
Link
Hook (other than a ramshorn hook)
Shackle
Swivel
Eye-bolt
Ramshorn hook
Under 50 tons
Twice the safe working load
50 tons to 100 tons
Safe working loads plus 50 tons
Over 100 tons
One and a half times the safe working load
Pulley blocks
Single sheave block
Four times the safe working load
Multiple sheave block with safe working load up to and including 20 tons
Twice the safe working load
Multiple sheave block with safe working load over 20 tons up to and including 40 tons
20 tons in excess of the safe working load
Multiple sheave block with safe working load over 40 tons
One and a half times the safe working load
Chains (other than calibrated load chains)
Twice the safe working load
Calibrated load chains
One and a half times the safe working load
(d) After being tested as aforesaid, every lifting appliance with the whole of the gear accessory thereto, every article of lifting gear and every chain shall be examined, and the sheaves and the pins of the pulley blocks shall be removed for the purpose of the examination, to see that no part is injured or permanently deformed by the test.
(e) In the case of wire ropes, a sample shall be tested to destruction.

---
Source: https://www.legislation.gov.uk/uksi/1960/1932/schedule/SECOND (the official version)
Page: https://openlegislation.uk/shipbuilding-and-ship-repairing-regulations-1960/schedule-SECOND
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.