Work No. 16 – shown on sheet 3 of the works plans and being the improvement of the existing Tidal Basin Roundabout for a length of 415 metres, to include—
(a) the construction of an improved, signalised three-lane roundabout gyratory section;
(b) the construction of an improved private means of access to the DLR assets, as shown on sheet 3 of the rights of way and access plans;
(c) the construction of an improved private means of access to existing statutory undertakers' apparatus, as shown on sheet 3 of the rights of way and access plans;
(d) the construction of an improved and signal-controlled non-motorised user route around and across the improved Tidal Basin Roundabout; and
(e) the construction of a drainage attenuation tank and associated infrastructure within the improved Tidal Basin Roundabout.

---
Source: https://www.legislation.gov.uk/uksi/2018/574/schedule/1/paragraph/wrapper18n1 (the official version)
Page: https://openlegislation.uk/silvertown-tunnel-order-2018/schedule-1/paragraph-wrapper18n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.