  "text": "Work No. 1 – shown on sheets 1, 2 and 3 of the works plans and being the construction of a twin bore highway tunnel for a length of 1,440 metres from a portal on the Greenwich peninsula in the Royal Borough of Greenwich, and passing beneath the river Thames, to a portal in Silvertown in the London Borough of Newham, to include—\n(a) the construction of a section of cut and cover tunnel, between its portal on the Greenwich peninsula (the South Portal) and the tunnel-boring machine launch chamber located on the Greenwich peninsula, and comprising either a cellular tunnel or two tunnels, one for northbound traffic and one for southbound traffic with two-lane carriageways in each direction, and including the south portal and cross-passages connecting the two tunnels;\n(b) the construction of a section of bored tunnel, comprising two tunnels, one for northbound traffic and one for southbound traffic, with two-lane carriageways in each direction, between the tunnel-boring machine launch chamber located in Silvertown and the tunnel-boring machine launch chamber located on the Greenwich peninsula, including cross-passages connecting the two tunnels;\n(c) the construction of a section of cut and cover tunnel between its portal in Silvertown (the North Portal) and the tunnel-boring machine launch chamber located in Silvertown, and comprising either a single cellular tunnel or two tunnels, one for northbound traffic and one for southbound traffic with two-lane carriageways in each direction, and including the north portal and cross-passages connecting the two tunnels;\n(d) the construction of an anti-recirculation wall at the South Portal;\n(e) the construction of two tunnel-boring machine launch chambers, one in the London Borough of Newham (Silvertown) and one in the Royal Borough of Greenwich (Greenwich peninsula); and\n(f) the construction (and subsequent removal on completion of construction of the authorised development) of a temporary decked car park situated on land lying between West Parkside and Millennium Way, and being required in consequence of the construction of Work Nos. 1 (a) and (d) (Greenwich peninsula) to provide replacement car parking facilities for the O2 Arena during construction of the authorised development.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2018/574/schedule/1/paragraph/wrapper3n1",
    "retrieved_at": "2026-10-28T22:58:06.787723+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}