# The Silvertown Tunnel Order 2018, Paragraph


Work No. 3 – shown on sheet 1 of the works plans and being the improvement of the existing two-lane A102 Blackwall Tunnel southern approach northbound carriageway over a length of 500 metres from a point level with the existing gantry on the existing southbound diverge slip road leading to Millennium Way to its tie-in with the existing carriageway at a point 65 metres north of the existing Blackwall Tunnel Gatehouse, to include—
(a) the improvement of the existing two-lane A102 Blackwall Tunnel southern approach northbound carriageway;
(b) the widening of the existing A102 Blackwall Tunnel southern approach northbound carriageway to accommodate a new two-lane diverge slip road to the northbound carriageway of the proposed Silvertown Tunnel southern approach northbound (Work No. 5);
(c) works associated with the improvement of the central reservation between the improved A102 Blackwall Tunnel southern approach northbound and southbound carriageways (Work No. 2(e));
(d) works associated with the construction of new cross-over facilities in the central reservation (Work No. 2(f));
(e) works associated with the construction of new overhead signage and traffic management equipment gantries (Work No. 2(g));
(f) the provision of planting and landscaping; and
(g) the removal of redundant existing gantries.

---
Source: https://www.legislation.gov.uk/uksi/2018/574/schedule/1/paragraph/wrapper5n1 (the official version)
Page: https://openlegislation.uk/silvertown-tunnel-order-2018/schedule-1/paragraph-wrapper5n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

