# The Silvertown Tunnel Order 2018, Paragraph


Work No. 4 – shown on sheet 1 of the works plans and being the works required for the improvement of the existing Tunnel Avenue from a point 65 metres south of a point level with the junction of the existing Tunnel Avenue with Morden Wharf Road, to a point adjacent to the location of the existing Blackwall Tunnel Gatehouse, to include—
(a) works to improve the alignment of the existing Tunnel Avenue to provide a segregated and independent local two-way carriageway over a length of 485 metres;
(b) the construction of new (replacement) private means of access to local business premises as shown on sheet 1 of the rights of way and access plans, and replacement car parking;
(c) the construction of an improved bus-only access to, and operational egress from, the A102 Blackwall Tunnel southern approach northbound carriageway (Work No. 3);
(d) the construction of a new hardened verge between the improved Tunnel Avenue and the A102 Blackwall Tunnel southern approach northbound carriageway (Work No. 3);
(e) the construction of new overhead signage and traffic management equipment gantries;
(f) the removal of redundant existing gantries; and
(g) the provision of improved non-motorised user route alongside the improved Tunnel Avenue.

---
Source: https://www.legislation.gov.uk/uksi/2018/574/schedule/1/paragraph/wrapper6n1 (the official version)
Page: https://openlegislation.uk/silvertown-tunnel-order-2018/schedule-1/paragraph-wrapper6n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.