# The Silvertown Tunnel Order 2018, Part 2: HIGHWAYS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED


(1) Area
(2) Highway to be stopped up
(3) Extent of stopping up
The rights of way and access plans – sheet 1
In the administrative area of the Royal Borough of Greenwich; in the county of Greater London
Pavilion Lane
A length from its junction with the existing Millennium Way in a generally southerly direction to the existing A102 Blackwall Tunnel southern approach Southbound, for a distance of 180 metres.
The rights of way and access plans – sheet 2
None
None
–
The rights of way and access plans – sheet 3
In the administrative area of the London Borough of Newham; in the county of Greater London
Layby north of the existing A1020 Lower Lea Crossing, 35 metres east of the existing overbridge, on which the A1020 Lower Lea Crossing passes over the Docklands Light Railway Woolwich Branch.
The whole layby.
Area north of the Tidal Basin Roundabout.
Area of existing carriageway forming part of the existing A1020 Lower Lea Crossing approaching the existing Tidal Basin Roundabout.

---
Source: https://www.legislation.gov.uk/uksi/2018/574/schedule/3/part/2 (the official version)
Page: https://openlegislation.uk/silvertown-tunnel-order-2018/schedule-3/part-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

