Work No. 2A

A cooling water intake tunnel for seawater extraction, commencing at Work No. 1A and terminating at Work No. 2B, including earthworks and tunnelling (Unit 1).

Work No. 2B

Two intake heads and vertical shafts for seawater extraction including excavation and capital dredging works (Unit 1).

Work No. 2C

A second cooling water intake tunnel for seawater extraction commencing at Work No. 1A, and terminating at Work No. 2D, including earthworks and tunnelling (Unit 2).

Work No. 2D

Two intake heads and vertical shafts for seawater extraction, including excavation and capital dredging works (Unit 2).

Work No. 2E

A cooling water outfall tunnel for seawater return, commencing at Work No. 1A and terminating at Work No. 2F, including earthworks and tunnelling.

Work No. 2F

Two outfall heads and vertical shafts for seawater return including excavation and capital dredging works.

Work No. 2G

A fish return tunnel, commencing at Work No. 1A and terminating at Work No. 2H, including earthworks and tunnelling.

Work No. 2H

A fish return outfall head and vertical shaft, including excavation and capital dredging works.

Work No. 2I

A second fish return tunnel, commencing at Work No. 1A and terminating at Work No. 2J, including earthworks and tunnelling.

Work No. 2J

A second fish return outfall head and vertical shaft including excavation and capital dredging works.

Work No. 2K

A combined drainage outfall tunnel, commencing at Work No. 1A and terminating at Work No. 2L, including earthworks and tunnelling.

Work No. 2L

A combined drainage outfall head and vertical shaft, including excavation and capital dredging works.

Work No. 2M

An intake tunnel for the temporary desalination plant, commencing at Work No. 1A and terminating at Work No. 2N, including earthworks and tunnelling.

Work No. 2N

An intake head and shaft for seawater extraction for the temporary desalination plant, including excavation and capital dredging works.

Work No. 2O

An outfall tunnel for the temporary desalination plant, commencing at Work No. 1A and terminating at Work No. 2P, including earthworks and tunnelling.

Work No. 2P

Outfall tunnel diffusers and shaft for brine water return for the temporary desalination plant, including excavation and capital dredging works.

The location of the above works is shown on sheet nos 2, 4, 5 and 6 of the Works Plans.