Main development site: operational infrastructure and Sizewell B relocation works Main development site: operational infrastructure and Sizewell B relocation works
An electricity generating station with a net electrical output of approximately 3,340MW power generated by two nuclear reactor units, to include—
buildings, structures and plant within the ’nuclear islands’ for Units 1 and 2, including—
two reactor buildings;
two fuel buildings;
two fuel building halls;
two boron storage buildings;
eight safeguard buildings;
two nuclear auxiliary buildings;
two nuclear auxiliary building stacks;
two access towers;
radioactive waste storage building;
radioactive waste process building;
radioactive waste treatment building;
hot laundry building;
hot workshop, hot warehouse, facilities for decontamination;
effluent tanks and refuelling water tanks;
four emergency diesel generator buildings and twelve associated stacks;
two ’type 1’ cooling water discharge weir buildings; and
two ’type 2’ cooling water discharge weir buildings;
buildings, structures and plant within the ’conventional islands’ for Units 1 and 2, including—
two turbine halls;
two sky bridges;
two conventional island electrical buildings;
two gas insulated switchgear buildings;
two main transformer platforms;
four unit transformer platforms;
two auxiliary transformer platforms; and
six monopoles;
operational service centre;
four electricity transmission towers / pylons inside the powers station’s security fence and associated transmission infrastructure;
buildings, structures and plant within the ’cooling water pumphouse and associated buildings’ for Units 1 and 2, including—
two cooling water pumphouses;
two forebays;
two outfall pond buildings;
two filtering debris recovery pits; and
two fire-fighting water distribution buildings;
intermediate level waste store;
interim spent fuel store;
buildings, structures and plant within the ’ancillary structures’, including (but not limited to)—
main access control building;
auxiliary administration building;
secondary access control building;
emergency response centre;
emergency response energy centre;
meteorological station;
demineralisation station;
valve room for the demineralisation station;
auxiliary boilers;
hydrogen storage;
oxygen storage;
hydrazine storage;
chlorination plant;
service ventilation building;
raw water & potable water storage/supply building;
degassed water storage tanks;
cooling water discharge shaft;
chemical products storage;
garage for handling materials;
oil & grease storage;
contaminated tools store;
warehouse;
sewage treatment plant;
conventional island water tanks;
nuclear island water tank;
conventional waste storage;
transit area for very low and low level waste;
service access buildings;
battery load banks;
interim spent fuel store equipment storage building; and
emergency equipment store.
132kV substation and associated compound;
off-site delivery check point, associated buildings, structures and plant;
permanent vehicular and pedestrian bridge over Sizewell Marshes SSSI, preceded by a temporary crossing.
permanent beach landing facility;
soft coastal defence feature;
permanent hard coastal defence feature, preceded by a temporary hard coastal defence feature;
buildings, structures and plant, including a new National Grid substation building, plant, equipment and apparatus, alterations to the existing National Grid substation building, plant, equipment and apparatus, and associated diversion of transmission infrastructure;
one electricity transmission tower /pylon outside the power station’s security fence, and associated transmission infrastructure including overhead line conductors;
770 permanent operational parking spaces and 600 outage parking spaces;
removal of an existing transmission tower / pylon and associated transmission infrastructure;
realignment of Sizewell Drain and associated works;
perimeter below-ground cut off-wall, including associated dewatering of the contained area;
drainage outfall tunnels comprising—
combined drainage outfall tunnel (continuing as Work No. 2K); and
temporary marine outfall;
power station main access road;
1,000 temporary car parking spaces and 75 temporary HGV parking spaces;
temporary freight management facility, 80 HGV parking spaces and associated infrastructure;
temporary park and ride facility, 600 associated car parking spaces, 20 bus spaces, a terminal area and associated infrastructure;
temporary water resource storage area;
temporary marine bulk import facility;
improvement works to Kenton Hills Car Park to include provision of up to 15 additional parking spaces;
flood mitigation area and associated habitat;
serviced pitches for up to 400 caravans and 400 temporary car parking spaces;
bat barn;
temporary junction onto King George’s Avenue;
temporary junction onto Valley Road
temporary junction onto Lovers Lane;
temporary desalination plant and associated infrastructure;
temporary desalination plant outfall tunnel (continuing as Work No. 2O); and
temporary desalination plant intake tunnel (continuing as Work No. 2M).
The location of the above works is shown on sheet nos 1-5 and 7-8 of the Works Plans.
Work No. 1B
New permanent four arm roundabout at B1122 Abbey Road including one site access point, plus a second temporary site access point using an additional temporary arm.
The location of the above works is shown on sheet nos 1 and 8 of the Works Plans.
Work No. 1C
Works associated with Lovers Lane, to include—
realignment of the junction of the B1122 Abbey Road and Lovers Lane;
realignment of Lovers Lane;
provision of a mammal culvert under Lovers Lane; and
creation of a right turn into Leiston Household Waste Recycling Centre.
The location of the above works is shown on sheet nos 3, 7 and 8 of the Works Plans.
Work No. 1D
Works associated with the relocation of certain Sizewell B power station facilities, to include—
outage store building;
outage laydown area;
training centre;
up to 112 operational car parking spaces and access roads;
up to 576 outage car parking spaces;
visitor centre;
administrative buildings to include workshops, civils store, office accommodation and general store;
storage, canteen and welfare facilities; and
outage car park access roads.
The location of the above works is shown on sheet nos 2, 4 and 5 of the Works Plans.
Work No. 1E
Works associated with the relocation of certain Sizewell B power station facilities, to include—
outage store building;
outage laydown area;
training centre;
up to 579 operational car parking spaces and access roads;
visitor centre;
administrative buildings to include workshops, civils store, office accommodation and general store; and
storage, canteen and welfare facilities.
The location of the above works is shown on sheet nos 2, 4 and 5 of the Works Plans.