Two village bypass Two village bypass
Work No. 11A
Works associated with the construction of Work No. 11B and Work No. 11C, to include—
site preparation works including construction hoardings, perimeter enclosure, ecological fencing and security, construction related buildings, structures, plant, machinery and construction lighting;
earthworks including creation of acoustic bunds, utilities trenches, surface water drainage system including balancing ponds and landscape works, including ecological works;
access roads, tracks and hardstanding;
construction of bridges and civil structures;
highway works including kerbs, footways and paved areas;
traffic signal poles and fittings;
lighting poles and fittings; and
perimeter fencing, ecological fencing, animal corrals, signage, gates and barriers.
Work No. 11B
A bypass of Farnham and Stratford St Andrew, to include—
a road (2.4km in length) commencing at a new four-arm roundabout to the east of Parkgate Farm and Stratford Plantation and terminating at a new four-arm roundabout to replace the existing junction of the A12 with the A1094 (Friday Street), and including a bridge crossing of the River Alde;
associated realignments and tie-ins of existing roads bi-sected by the bypass and other existing roads adjoining the bypass; and
new and altered private means of access.
Work No. 11C
A footbridge over the bypass (Work No. 11B(a)) 150m east of Farnham Hall.
The location of the above works is shown on sheet nos 17 and 18 of the Works Plans.