OpenLegislation

Paragraph 110 Interaction at Sizewell Gap

Original text. Later amendments are not shown.

The undertaker shall consult with EA2 in the formulation of the proposed method of working and timing of execution of—

(a)

works within the area labelled “transport area of interaction” and shaded orange on the EA2 Sizewell Gap Transport Interaction Plan (Drawing No. SZC-SZ0100-XX-000-DRW-100291); and

(b)

works which may affect the highway within the area labelled “transport area of interaction”,

prior to any works comprised within Work No. 1A or Work No. 1C commencing within the area labelled “transport area of interaction”.