  "legislation_title": "The Sizewell C (Nuclear Generating Station) Order 2022",
  "legislation_url": "https://openlegislation.uk/sizewell-c-nuclear-generating-station-order-2022",
  "path": "schedule/21/paragraph/20",
  "kind": "paragraph",
  "number": "20",
  "heading": "During construction, operation and maintenance",
  "text": "(1) Drill or vibro piling must be used as standard, with percussive piling only used if it is required to drive a pile to its design depth and drill or vibro piling has been unsuccessful. If percussive piling is necessary, soft-start procedures must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved.\n(2) The soft-start duration must be a period of not less than 20 minutes.\n(3) Should piling cease for a period greater than 10 minutes then the soft start procedure must be repeated.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/853/schedule/21/paragraph/20",
    "retrieved_at": "2026-10-28T21:56:59.101250+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}