OpenLegislation

Paragraph 26 During construction, operation and maintenance

Original text. Later amendments are not shown.

The undertaker must ensure that any vessels used for rock or shingle transhipment or other delivery operations are suitably constructed and loaded to prevent material falling over the side by accident. Suitable screening must be used to prevent rock or shingle loss through drainage holes.