Paragraph 43 Cooling Water Intake and Outfall Heads, Shafts and Tunnels
Drill arisings from Work Nos. 2B, 2D and 2F must only be deposited within the “Sizewell C” disposal site set out in Part 4 (Table 10).
Drill arisings from Work Nos. 2B, 2D and 2F must only be deposited within the “Sizewell C” disposal site set out in Part 4 (Table 10).