Paragraph 4 Ongoing obligation to provide annual declarations relating to feedstock types
(1)
A SEG generator must provide the Authority with a declaration containing the following information for each annual reporting period—
(a)
the total amount of electricity generated during the period by the AD installation;
(b)
details of the type of feedstock used to make the biogas used to generate the electricity; and
(c)
the proportion of the energy content of the biogas which was not derived from waste or residue, expressed as a decimal and rounded to 4 decimal places.
(2)
The SEG generator must provide the declaration within 3 months after end of the annual reporting period to which the declaration relates.